UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
Form 6-K
REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934
January 21, 2009
BHP BILLITON LIMITED | BHP BILLITON PLC | |
(ABN 49 004 028 077) | (REG. NO. 3196209) | |
(Exact name of Registrant as specified in its charter) | (Exact name of Registrant as specified in its charter) |
VICTORIA, AUSTRALIA | ENGLAND AND WALES | |
(Jurisdiction of incorporation or organisation) | (Jurisdiction of incorporation or organisation) | |
180 LONSDALE STREET, MELBOURNE, VICTORIA 3000 AUSTRALIA |
NEATHOUSE PLACE, VICTORIA, LONDON, UNITED KINGDOM | |
(Address of principal executive offices) | (Address of principal executive offices) |
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F:
[x] Form 20-F [ ] Form 40-F
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): [ ]
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): [ ]
Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934: [ ] Yes [x] No
If Yes is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b): n/a
NEWS RELEASE
Release Time | IMMEDIATE | |
Date | 21 January 2009 | |
Number | 03/09 |
BHP BILLITON QUARTERLY REPORT ON
EXPLORATION AND DEVELOPMENT ACTIVITIES
QUARTER ENDED 31 DECEMBER 2008
DEVELOPMENT
BHP Billitons strong balance sheet allows us to invest through the cycle with a highly disciplined and value-focused approach.
Highlighting our commitment to value accretive longer term growth, we sanctioned two projects during the quarter, being the Western Australia Iron Ore Rapid Growth Project 5 (RGP5), and the North West Shelf Cossack, Wanaea, Lambert, Hermes (CWLH) Life Extension projects.
PROJECT AND |
SHARE OF APPROVED |
INITIAL PRODUCTION |
PRODUCTION CAPACITY |
QUARTERLY PROGRESS | ||||
Petroleum Projects | ||||||||
Shenzi (USA) 44% Oil/Gas |
1,940 | Mid CY09 | 100,000 barrels of oil and 50 million cubic feet gas per day | Ahead of schedule and on budget. Hook-up and commissioning continuing. Six wells drilled and completed. | ||||
Atlantis North (USA) 44% Oil/Gas |
185 | H2 CY09 | Tieback to Atlantis South | On schedule and budget. Manifold fabrication continuing. | ||||
Pyrenees (Australia) 71.43% Oil/Gas |
1,200 | H1 CY10 | 96,000 barrels of oil and 60 million cubic feet gas per day | On schedule and budget. Subsea hardware delivery commenced and Floating Production Storage and Offtake (FPSO) conversion continues. | ||||
Angostura Gas Phase II (Trinidad and Tobago) 45% Gas |
180 | H1 CY11 | 280 million cubic feet gas per day | On schedule and budget. Awarded transportation and installation contract. Executed National Gas Company Interconnection Agreement. |
PROJECT AND |
SHARE OF APPROVED |
INITIAL PRODUCTION |
PRODUCTION CAPACITY |
QUARTERLY PROGRESS | ||||
Bass Strait Kipper (Australia) 32.5% - 50% Gas/Gas Liquids |
500 | CY11 | 10,000 bpd condensate and processing capacity of 80 million cubic feet gas per day | On schedule and budget. Drilling rig secured. Detailed engineering progressing and commenced West Tuna platform retrofit work. | ||||
Bass Strait Turrum (Australia) 50% Gas/Gas Liquids |
625 | CY11 | 11,000 bpd condensate and processing capacity of 200 million cubic feet gas per day | On schedule and budget. Engineering and procurement progressing. | ||||
North West Shelf CWLH Life Extension (Australia) 16.67% Oil |
245 | CY11 | Replacement vessel with capacity of 60,000 bpd oil | The project was sanctioned during the quarter. See News Release dated 3 December 2008. | ||||
North West Shelf North Rankin B Gas Compression (Australia) 16.67% LNG |
850 | CY12 | 2,500 million cubic feet gas per day | On schedule and budget. Detailed engineering and procurement well advanced. Jacket fabrication commenced. | ||||
Minerals Projects | ||||||||
Alumar Refinery Expansion (Brazil) 36% Alumina |
900 | Q2 CY09 | 2 million tpa of additional alumina | On schedule and revised budget. Engineering is complete and procurement well advanced. Construction is 82% complete with the project overall 92% complete. | ||||
Worsley Efficiency & Growth (Australia) 86% Alumina |
1,900 | H1 CY11 | 1.1 million tpa of additional alumina | On schedule and budget. Engineering is 49% complete and construction camp now operational. | ||||
Iron Ore (Western Australia) RGP4 86.2% Iron Ore |
1,850 | H1 CY10 | 26 million tpa additional iron ore system capacity | On schedule and budget. Engineering is now over 95% complete and construction is nearing 70% complete. | ||||
Iron Ore (Western Australia) RGP5 85% Iron Ore |
4,800 | H2 CY11 | 50 million tpa additional iron ore system capacity | The project was sanctioned during the quarter. See News Release dated 25 November 2008. Preliminary engineering and construction activities have commenced. |
2
PROJECT AND |
SHARE OF APPROVED |
INITIAL PRODUCTION |
PRODUCTION CAPACITY |
QUARTERLY PROGRESS | ||||
Gemco (Australia) 60% Manganese |
110 | H1 CY09 | 1 million tpa of additional manganese concentrate | On schedule and budget in local currency. Cyclone tower operational and remainder of installation activities progressing well. Project is 77% complete. | ||||
Klipspruit (South Africa) 100% Energy Coal |
450 | H2 CY09 | Incremental 1.8 million tpa export thermal coal Incremental 2.1 million tpa domestic thermal coal |
On schedule and budget. Earthworks and civil and mechanical construction progressing well. The project is 70% complete with detailed commission planning commenced. | ||||
Douglas-Middelburg Optimisation (South Africa) 100% Energy Coal |
975 | Mid CY10 | 10 million tpa export thermal coal and 8.5 million tpa domestic thermal coal (sustains current output) | On schedule and budget. Construction activities are progressing well with steel erection commencing as scheduled. The project is 34% complete. | ||||
Newcastle Third Port Project (Australia) 35.5% Energy Coal |
390 | CY10 | 30 million tpa export coal loading facility | On schedule and budget. Project is over 35% complete. |
MINERALS EXPLORATION
BHP Billiton continues to identify and prioritise various exploration activities. All of the exploration activities are reviewed regularly to ensure that we are capturing value accretive opportunities for future development.
Selection study work on the proposed Olympic Dam Expansion (Australia) is effectively complete. A Draft Environmental Impact Statement (EIS) based on the five stage project configuration has been provided to the Federal, South Australian and Northern Territory Governments for a compliance review, with the intention that it be released for public comment during the first half of calendar year 2009. Pending government approvals for the EIS and consistent with the prevailing economic circumstances, project activity will be scaled back to that necessary to support the approvals process and the study of a number of mining and processing technology options. Olympic Dam Expansion expenditure for the six months ended 31 December 2008 was US$112 million, of which US$29 million was capitalised.
Grassroots exploration continued on targets in Australia, Chile, Argentina, Zambia and the Democratic Republic of Congo (DRC); and on diamond targets in Canada. Exploration for iron ore, coal, bauxite and manganese was undertaken in a number of regions including Australia, South America, Russia and West Africa.
For the six months ended 31 December 2008, BHP Billiton spent US$357 million on minerals exploration, of which US$313 million was expensed.
3
PETROLEUM EXPLORATION
Exploration and appraisal wells drilled during the quarter or in the process of drilling as at 31 December 2008.
WELL |
LOCATION |
BHP BILLITON EQUITY |
STATUS | |||
Lambert-8 | Dampier Sub-Basin Western Australia WA-16-L |
16.67% BHP Billiton (Woodside operator) |
Plugged and abandoned. Hydrocarbons encountered. | |||
Lambert West | Dampier Sub-Basin Western Australia WA-16-L |
16.67% BHP Billiton (Woodside operator) |
Plugged and abandoned. Hydrocarbons encountered. | |||
Lady Nora-2 | Dampier Sub-Basin Western Australia WA-28-P |
16.67% BHP Billiton (Woodside operator) |
Plugged and abandoned. Hydrocarbons encountered. | |||
Nereus-1 | Dampier Sub-Basin Western Australia WA-28-P |
16.67% BHP Billiton (Woodside operator) |
Plugged and abandoned. Dry hole. | |||
Tidepole-2 | Dampier Sub-Basin Western Australia WA-5-L |
16.67% BHP Billiton (Woodside operator) |
Drilling ahead. | |||
Torosa-5 | Browse Basin Western Australia WA-30-R |
8.33% BHP Billiton (Woodside operator) |
Plugging and abandoning. Hydrocarbons encountered. | |||
Puma-4 | Green Canyon Gulf of Mexico GC823-2 |
29.805% BHP Billiton (BP Operator) |
Drilling ahead. | |||
Shenzi-8 | Green Canyon Gulf of Mexico GC610 |
44% BHP Billiton, operator | Hydrocarbons encountered. Suspended. |
Petroleum exploration expenditure for the six months ended 31 December 2008 was US$263 million, of which US$183 million was expensed
Further information on BHP Billiton can be found on our website: www.bhpbilliton.com
Australia |
United Kingdom & South Africa | |
Samantha Evans, Media Relations | Andre Liebenberg, Investor Relations | |
Tel: +61 3 9609 2898 Mobile: +61 400 693 915 | Tel: +44 20 7802 4131 Mobile: +44 7920 236 974 | |
email: Samantha.Evans@bhpbilliton.com | email: Andre.Liebenberg@bhpbilliton.com | |
Peter Ogden, Media Relations | Illtud Harri, Media Relations | |
Tel: +61 3 9609 2812 Mobile: +61 428 599 190 | Tel: +44 20 7802 4195 Mobile: +44 7920 237 246 | |
email: Peter.Ogden@bhpbilliton.com | email: Illtud.Harri@bhpbilliton.com | |
Kelly Quirke, Media Relations | United States | |
Tel: +61 3 9609 2896 Mobile: +61 429 966 312 | Scott Espenshade, Investor Relations | |
email: Kelly.Quirke@bhpbilliton.com | Tel: +1 713 599 6431 Mobile: +1 713 208 8565 | |
email: Scott.Espenshade@bhpbilliton.com | ||
Leng Lau, Investor Relations | Ruban Yogarajah, Media Relations | |
Tel: +61 3 9609 4202 Mobile: +61 403 533 706 | Tel: US +1 713 966 2907 or UK +44 20 7802 4033 | |
email: Leng.Y.Lau@bhpbilliton.com | Mobile: UK +44 7827 082 022 | |
email: Ruban.Yogarajah@bhpbilliton.com | ||
BHP Billiton Limited ABN 49 004 028 077 | BHP Billiton Plc Registration number 3196209 | |
Registered in Australia | Registered in England and Wales | |
Registered Office: 180 Lonsdale Street | Registered Office: Neathouse Place | |
Melbourne Victoria 3000 Australia | London SW1V 1BH United Kingdom | |
Tel +61 1300 55 4757 Fax +61 3 9609 3015 | Tel +44 20 7802 4000 Fax +44 20 7802 4111 |
A member of the BHP Billiton group which is headquartered in Australia
4
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
BHP Billiton Limited and BHP Billiton Plc | ||||||
Date: 21 January 2009 | By: | /s/ Jane McAloon | ||||
Name: | Jane McAloon | |||||
Title: | Group Company Secretary |