Ended December 31,
|
2006
|
2005
|
2004
|
|||||||
(in thousands) | ||||||||||
Material
sales to unaffiliated parties
|
$
|
410,159
|
$
|
334,290
|
$
|
264,353
|
||||
Percent
of total revenue
|
13.8
|
%
|
12.7
|
%
|
12.4
|
%
|
||||
Percent
of Branch Division revenue
|
22.2
|
%
|
21.0
|
%
|
20.5
|
%
|
December 31, |
2006
|
|
|
2005
|
||||
Heavy
construction equipment (units)
|
2,641 |
2,467
|
||||||
Trucks,
truck-tractors and trailers and vehicles (units)
|
5,338 |
4,958
|
||||||
Aggregate
crushing plants
|
55
|
50
|
||||||
Asphalt
concrete plants
|
53
|
56
|
||||||
Portland
cement concrete batch plants
|
25
|
25
|
||||||
Asphalt
rubber plants
|
4
|
4
|
||||||
Lime
slurry plants
|
9
|
9
|
·
|
Our
success depends on attracting and retaining
qualified personnel in a competitive environment. The
single largest factor in our ability to profitably execute
our work is our
ability to attract, develop and retain qualified personnel.
Our success in
attracting qualified people is dependent on the resources available
in
individual geographic areas and the impact on the labor supply
due to
general economic conditions as well as our ability to provide
a
competitive compensation package and work
environment.
|
·
|
Economic
downturns and reductions in government
funding could have a negative impact on our
business. Significant portions of our revenues
are derived from contracts that are funded by federal, state
and local
government agencies. Our ability to obtain future public sector
work at
reasonable margins is highly dependent on the amount of work
that is
available to bid, which is largely a function of the level of
government
funding available. We also perform commercial and residential
site
development and other work for customers in the private sector.
The
availability of this private sector work can be significantly
adversely
affected by general economic downturns.
|
·
|
Our
fixed price and fixed unit price contracts subject us to the
risk of
increased project cost. As more fully described under
“Contract Provisions and Subcontracting” above, the profitability of our
fixed price and fixed unit price contracts can be adversely affected
by a
number of factors that can cause our actual costs to materially
exceed the
costs estimated at the time of our original
bid.
|
·
|
Accounting
for our revenues and costs involves significant
estimates. As further described in “Critical Accounting
Estimates” under “Item 7. Management’s Discussion and Analysis of
Financial Condition and Results of Operation,” accounting for our contract
related revenues and costs, as well as other cost items, requires
management to make a variety of significant estimates and assumptions.
Although we believe we have sufficient experience and processes
to enable
us to formulate appropriate assumptions and produce reasonably
dependable
estimates, these assumptions and estimates may change significantly
in the
future, and these changes could result in the reversal of
previously recognized revenue and profit and have a material
adverse
effect on our financial position and the results of our
operations.
|
·
|
Many
of our contracts have penalties for late
completion. In some instances, including many of
our fixed price contracts, we guarantee that we will complete
a project by
a scheduled date. If we subsequently fail to complete the project
as
scheduled we may be held responsible for cost impacts resulting
from any
delay, generally in the form of contractually agreed-upon liquidated
damages. To the extent that these events occur, the total costs
of the
project could exceed our original estimates and we could experience
reduced profits or, in some cases, a loss for that
project.
|
·
|
Weather
can significantly impact our quarterly revenues and
profitability. Our ability to perform work is
significantly impacted by weather conditions such as precipitation
and
temperature. Changes in weather conditions can create significant
variability in our quarterly revenues and profitability, particularly
in
the first and fourth quarters of the year. Additionally, delays
and other
weather impacts may increase a project’s cost and decrease its
profitability.
|
·
|
We
work in a highly competitive marketplace. As more
fully described under “Competition” above, we have multiple competitors in
all of the areas in which we work. During economic down cycles
or times of
lower government funding for public works projects, competition
for the
fewer available projects intensifies and this increased competition
may
result in a decrease in our ability to be competitive at acceptable
margins.
|
·
|
An
inability to secure and permit aggregate
reserves could negatively impact our future operations and
results. Tighter regulations for the protection of the
environment and the finite nature of property containing suitable
aggregate reserves are making it increasingly challenging and
costly to
secure and permit aggregate reserves. Although we have thus far
been able
to secure and permit reserves to support our business, it is
likely to
become increasingly difficult to do so and there is no assurance
that we
will be able to secure and permit reserves in the
future.
|
·
|
We
are subject to environmental and other
regulation. As more fully described under
“Government and Environmental Regulations” above, we are subject to a
number of federal, state and local laws and regulations relating
to the
environment, workplace safety and a variety of socioeconomic
requirements, the noncompliance of which can result in substantial
penalties, termination or suspension of government contracts as well
as civil and criminal liability. While compliance with these
laws and
regulations has not materially adversely affected our operations
in the
past, there can be no assurance that these requirements will
not change
and that compliance will not adversely affect our operations
in the
future.
|
·
|
Strikes
or work stoppages could have a negative impact on our operations
and
results. We are party to collective bargaining
agreements covering a portion of our craft workforce. Although our
results and operations have not been significantly impacted
by strikes or
work stoppages in the past, such labor actions could have a
significant
impact on our operations if they occur in the
future.
|
·
|
Unavailability
of insurance coverage could have a negative impact on our operations
and
results. We maintain insurance coverage as part of our
overall risk management strategy and pursuant to requirements to
maintain specific coverage that are contained in our financing
agreements
and in most of our construction contracts. Although we have been
able to
obtain insurance coverage to meet our requirements in the past,
there is
no assurance that such insurance coverage will be available in
the
future.
|
·
|
An
inability to obtain bonding would have a
negative impact on our operations and results. As more
fully described in “Insurance and Bonding” above, we generally are
required to provide surety bonds securing our performance under
the
majority of our public and private sector contracts. Our inability
to
obtain surety bonds in the future would significantly impact
our ability
to obtain new contracts, which would have a material adverse
effect on our
business.
|
·
|
Our
joint venture contracts with project owners subject us to joint
and
several liability. If a joint venture partner fails to
perform we could be liable for completion of the entire contract
and, if
the contract were unprofitable, this could result in a material
adverse
effect on our financial position, results of operations and
cash
flows.
|
·
|
We
use certain commodity products that are subject to significant
price
fluctuations. Diesel fuel, liquid asphalt and
other petroleum-based products are used to fuel and
lubricate our equipment and fire our asphalt concrete
processing plants and also constitute a significant part of the
asphalt paving materials that are used in many of our construction
projects and sold to outside parties. Although we are partially
protected by asphalt or fuel price escalation clauses in some
of our
contracts, many contracts provide no such protection. We also use
cement, steel and other commodities in our construction projects that
can be subject to significant price fluctuations. We have not
been
significantly adversely affected by price fluctuations in the
past;
however, there is no guarantee that we will not be in the
future.
|
·
|
As
a part of our growth strategy we expect to make future acquisitions
and
acquisitions involve many risks. These risks include
difficulties integrating the operations and personnel of the
acquired
companies, diversion of management’s attention from our ongoing
operations, potential difficulties and increased costs associated
with
completion of any assumed construction projects, insufficient
revenues to
offset increased expenses associated with acquisitions and the
potential
loss of key employees or customers of the acquired companies.
Acquisitions
may also cause us to increase our liabilities, record goodwill
or other
non-amortizable intangible assets that will be subject to subsequent
impairment testing and potential impairment charges and incur
amortization
expenses related to certain other intangible assets. Failure
to manage and
successfully integrate acquisitions could harm our business and
operating
results significantly.
|
· |
Our goodwill may be impaired and result in a charge to income. We have accounted for our past acquisitions using the “purchase” method of accounting. Under the purchase method, we recorded, at fair value, assets acquired and liabilities assumed, and we recorded as goodwill the difference between the cost of acquisitions and the sum of the fair value of tangible and identifiable intangible assets acquired, less liabilities assumed. At December 31, 2006, our goodwill balance was $9.9 million. In accordance with Statement of Financial Accounting Standards No. 142, “Goodwill and Other Intangible Assets,” our recorded goodwill is not amortized but instead is subject to an impairment review on at least an annual basis. In the future, if our goodwill is determined to be impaired, the impairment would result in a charge to income from operations in the year of the impairment with a resulting decrease in our recorded net worth. |
·
|
Failure
of our subcontractors to perform as anticipated could have a
negative
impact on our results. As further described under
“Contract Provisions and Subcontracting” above, we subcontract a portion
of many of our contracts to specialty subcontractors and we are
ultimately
responsible for the successful completion of their work. Although
we seek
to require bonding or other forms of guarantees, we are not always
successful in obtaining those bonds or guarantees from our higher
risk
subcontractors, and there is no guarantee that we will not incur
a
material loss due to subcontractor performance
issues.
|
·
|
We
may be unable to identify qualified Disadvantaged Business Enterprise
(“DBE”) contractors to perform as subcontractors. Certain of
our government agency projects contain minimum DBE participation
clauses.
If we subsequently fail to complete these projects with the minimum
DBE
participation we may be held responsible for damages due to breach
of
contract including restrictions on our ability to bid on future
projects
and monetary damages.
To the extent that these events occur, the total costs of the
project
could exceed our original estimates and we could experience reduced
profits or, in some cases, a loss for that
project.
|
·
|
A
significant portion of our revenue is from government funded
contracts.
Approximately
68% of our consolidated revenue in 2006 was derived from
performing
contracts funded by federal, state and local government agencies
and
authorities. These government contracts are subject to specific
procurement regulations, contract provisions and a variety
of
socioeconomic requirements relating to their formation, administration,
performance and accounting. Many of these contracts include
express or
implied certifications of compliance with applicable laws
and contract
provisions. As a result of our government contracting, claims
for civil or
criminal fraud may be brought by the government for violations
of these
regulations, requirements or statutes. We may also be subject
to qui tam
litigation brought by private individuals on behalf of the
government
under the Federal Civil False Claims Act, which could include
claims for
up to treble damages. Further, if we fail to comply with
any of these
regulations, requirements or statutes, our existing government
contracts
could be terminated, we could be suspended from government
contracting or
subcontracting, including federally funded projects at the
state level. If
our government contracts are terminated for any reason, or
if we are
suspended from government work, we could suffer a significant
reduction in
expected revenue.
|
·
|
Our
long-term debt and credit arrangements contain restrictive covenants
and
failure to meet these covenants could significantly harm our
financial
condition. Our long-term debt and credit arrangements
and related restrictive covenants are more fully described in
Note 10
of the “Notes to the Consolidated Financial Statements” included in this
report. In most cases, failure to meet the restrictive covenants
would
result in an immediate repayment of all amounts due and cancellation
of
open lines of credit. Additionally, failure to meet restrictive
covenants
related to our debt and credit agreements would trigger cross-default
provisions that would cause us to also be in default of our surety
agreements. Although we have not had difficulty meeting these
covenants in
the past, failure to do so in the future could have material
adverse
effects on our business and financial
condition.
|
|
||
·
|
Our
backlog is subject to unexpected adjustments and cancellations
and could
be an uncertain indicator of our future earnings. We cannot
guarantee that the revenues projected in our backlog will be
realized or,
if realized, will result in profits. Projects may remain in our
backlog
for an extended period of time. In addition, project cancellations
or
scope adjustments may occur, from time to time, with respect
to contracts
reflected in our backlog. Backlog reductions can adversely affect
the
revenue and profit we actually receive from contracts reflected
in our
backlog. Future project cancellations and scope adjustments could
further
reduce the dollar amount of our backlog and the revenues and
profits that
we actually receive.
|
|
Land
Area (acres)
|
Building
Square Feet
|
Permitted
Aggregate Reserves (tons)
|
Unpermitted
Aggregate Reserves
(tons)
|
Office
and shop space (owned and leased)
|
1,400
|
1,050,000
|
N/A
|
N/A
|
Owned
quarry property
|
N/A
|
N/A
|
430.0
million
|
125.0
million
|
Leased
quarry property
|
N/A
|
N/A
|
355.0
million
|
645.0
million
|
Real
estate held for sale
|
2,800
|
60,000
|
N/A
|
N/A
|
Name
|
Age
|
Position
|
William
G. Dorey
|
62
|
President,
Chief Executive Officer and Director
|
Mark
E. Boitano
|
58
|
Executive
Vice President and Chief Operating Officer
|
William E. Barton | 62 |
Senior
Vice President and Chief Financial Officer
|
Michael F. Donnino | 52 |
Senior
Vice President and Heavy Construction Division Manager
|
James
H. Roberts
|
50
|
Senior
Vice President and Branch Division
Manager
|
Period
|
Total
number of shares purchased1
|
Average
price paid per share
|
Total
number of shares purchased as part of publicly announced plans
or
programs2
|
Approximate
dollar value of shares that may yet be purchased under the plans
or
programs2
|
|||||||||
October
1, 2006 through October 31, 2006
|
-
|
-
|
-
|
$
|
22,787,537
|
||||||||
November
1, 2006 through November 30, 2006
|
-
|
-
|
-
|
$
|
22,787,537
|
||||||||
December
1, 2006 through December 31, 2006
|
19,512
|
$ |
51.08
|
-
|
$
|
22,787,537
|
|||||||
|
19,512 | $ |
51.08
|
-
|
2001
|
2002
|
2003
|
2004
|
2005
|
2006
|
||||||||||||||
Granite
Construction Incorporated
|
$ |
100
|
$ |
65.43
|
$ |
101.27
|
$ |
116.72
|
$ |
159.63
|
$ |
225.54
|
|||||||
S
& P 500
|
100
|
77.90
|
100.24
|
111.15
|
116.61
|
135.03
|
|||||||||||||
Dow
Jones US Heavy Construction
|
100
|
83.87
|
114.41
|
138.74
|
200.48
|
250.08
|
Selected
Consolidated Financial Data
|
||||||||||||||||
Years
Ended December 31,
|
2006
|
2005
|
2004*
|
2003
|
2002
|
|||||||||||
Operating
Summary
|
(In
Thousands, Except Per Share Data)
|
|||||||||||||||
Revenue
|
$ |
2,969,604
|
$ |
2,641,352
|
$ |
2,136,212
|
$ |
1,844,491
|
$ |
1,764,742
|
||||||
Gross
profit
|
295,720
|
319,372
|
222,021
|
226,450
|
224,584
|
|||||||||||
As
a percent of revenue
|
10.0
|
12.1
|
10.4
|
12.3
|
12.7
|
|||||||||||
General
and administrative expenses
|
204,281
|
183,392
|
157,035
|
151,879
|
146,467
|
|||||||||||
As
a percent of revenue
|
6.9
|
6.9
|
7.4
|
8.2
|
8.3
|
|||||||||||
Provision
for (reversal of) legal judgment
|
(4,800
|
) |
9,300
|
-
|
-
|
-
|
||||||||||
Goodwill
impairment charge**
|
18,011
|
-
|
-
|
-
|
-
|
|||||||||||
Net
income
|
80,509
|
83,150
|
57,007
|
60,504
|
49,279
|
|||||||||||
As
a percent of revenue
|
2.7
|
3.1
|
2.7
|
3.3
|
2.8
|
|||||||||||
Net
income per share:
|
||||||||||||||||
Basic
|
$ |
1.97
|
$ |
2.05
|
$ |
1.41
|
$ |
1.51
|
$ |
1.23
|
||||||
Diluted
|
1.94
|
2.02
|
1.39
|
1.48
|
1.21
|
|||||||||||
Weighted
average shares of common stock:
|
||||||||||||||||
Basic
|
40,874
|
40,614
|
40,390
|
40,175
|
40,016
|
|||||||||||
Diluted
|
41,471
|
41,249
|
41,031
|
40,808
|
40,723
|
|||||||||||
Balance
Sheet
|
||||||||||||||||
Total
assets
|
$ |
1,632,838
|
$ |
1,472,230
|
$ |
1,277,954
|
$ |
1,060,410
|
$ |
983,819
|
||||||
Cash,
cash equivalents and marketable securities
|
394,878
|
301,381
|
277,692
|
201,985
|
182,694
|
|||||||||||
Working
capital
|
319,762
|
367,801
|
355,927
|
274,947
|
220,396
|
|||||||||||
Current
maturities of long-term debt
|
28,660
|
26,888
|
15,861
|
8,182
|
8,640
|
|||||||||||
Long-term
debt
|
78,576
|
124,415
|
148,503
|
126,708
|
132,380
|
|||||||||||
Other
long-term liabilities
|
58,419
|
46,556
|
40,641
|
29,938
|
13,742
|
|||||||||||
Shareholders’
equity
|
694,544
|
621,560
|
550,474
|
504,891
|
454,869
|
|||||||||||
Book
value per share
|
16.60
|
14.91
|
13.23
|
12.16
|
11.03
|
|||||||||||
Dividends
per share
|
0.40
|
0.40
|
0.40
|
0.40
|
0.32
|
|||||||||||
Common
shares outstanding
|
41,834
|
41,682
|
41,612
|
41,528
|
41,257
|
|||||||||||
Backlog
|
$ |
2,256,587
|
$ |
2,331,540
|
$ |
2,437,994
|
$ |
1,985,788
|
$ |
1,856,451
|
|
||||||||||
Comparative Financial Summary | ||||||||||
Years
ended December 31,
|
2006
|
2005
|
2004
|
|||||||
(in thousands) | ||||||||||
Total
revenue
|
$
|
2,969,604 |
$
|
2,641,352
|
$
|
2,136,212
|
||||
Gross
profit
|
295,720
|
|
319,372
|
|
222,021
|
|
||||
General
and administrative expenses
|
|
204,281
|
|
183,392
|
|
157,035
|
||||
Provision
for (reversal of) legal judgment
|
(4,800
|
)
|
9,300
|
|
-
|
|
||||
Goodwill impairment charge | 18,011 | - |
-
|
|||||||
Gain
on sale of property and equipment
|
|
10,408
|
|
8,235
|
|
|
18,566
|
|
||
Operating
income
|
|
88,636
|
|
134,915
|
|
83,552
|
||||
Net
income
|
|
80,509
|
|
|
83,150
|
|
|
57,007
|
|
Total Revenue | |||||||||||||||||||
Years ended December 31, |
2006
|
2005
|
2004
|
||||||||||||||||
(in
thousands)
|
Amount
|
Percent
|
Amount
|
Percent
|
Amount
|
Percent
|
|||||||||||||
Revenue
by Division:
|
|||||||||||||||||||
Branch
Division
|
$
|
1,848,725
|
62.3
|
|
$
|
1,591,545
|
60.3
|
|
$
|
1,287,615
|
60.3
|
|
|||||||
Heavy
Construction Division
|
1,085,888
|
36.6
|
|
1,030,109
|
39.0
|
|
848,597
|
39.7
|
|
||||||||||
Other
|
34,991 | 1.1 | 19,698 | 0.7 | - | - | |||||||||||||
Total
|
$ | 2,969,604 |
100.0
|
|
$
|
2,641,352
|
100.0
|
|
$
|
2,136,212
|
100.0
|
|
Branch Division Revenue | |||||||||||||||||||
Years ended December 31, |
2006
|
2005
|
2004
|
||||||||||||||||
(in thousands) |
Amount
|
Percent
|
Amount
|
Percent
|
Amount
|
Percent
|
|||||||||||||
California:
|
|||||||||||||||||||
Public
sector
|
$ |
537,967
|
48.5
|
|
$ |
374,642
|
43.0
|
|
$ |
397,349
|
53.9
|
|
|||||||
Private
sector
|
300,245
|
27.0
|
|
282,752
|
32.4
|
|
174,282
|
23.6
|
|
||||||||||
Material
sales
|
272,039
|
24.5
|
|
214,520
|
24.6
|
|
165,379
|
22.5
|
|
||||||||||
Total
|
$ | 1,110,251 |
100.0
|
|
$ |
871,914
|
100.0
|
|
$ |
737,010
|
100.0
|
|
|||||||
West
(excluding California):
|
|||||||||||||||||||
Public
sector
|
$ |
429,288
|
58.1
|
|
$ |
437,677
|
60.8
|
|
$ |
355,143
|
64.5
|
|
|||||||
Private
sector
|
171,166
|
23.2
|
|
164,821
|
22.9
|
|
97,641
|
17.7
|
|
||||||||||
Material
sales
|
138,020
|
18.7
|
|
117,133
|
16.3
|
|
97,821
|
17.8
|
|
||||||||||
Total
|
$ | 738,474 |
100.0
|
$ |
719,631
|
100.0
|
$ |
550,605
|
100.0
|
||||||||||
Total Branch Division Revenue: | |||||||||||||||||||
Public
sector
|
$ | 967,255 | 52.3 | $ | 812,319 | 51.0 | $ | 752,492 | 58.4 | ||||||||||
Private
sector
|
471,411 | 25.5 | 447,573 | 28.1 | 271,923 | 21.1 | |||||||||||||
Material
sales
|
410,059 | 22.2 | 331,653 | 20.9 | 263,200 | 20.5 | |||||||||||||
Total
|
$ | 1,848,725 | 100.0 | $ | 1,591,545 | 100.0 | $ | 1,287,615 | 100.0 |
|
|||||||||||||||||||
HCD
Revenue
|
|||||||||||||||||||
Years ended December 31, |
2006
|
2005
|
2004
|
||||||||||||||||
(in
thousands)
|
Amount
|
Percent
|
Amount
|
Percent
|
Amount
|
Percent
|
|||||||||||||
Revenue
by Geographic Area:
|
|||||||||||||||||||
Midwest
|
$
|
58,726
|
5.4
|
$
|
92,931
|
9.0
|
$
|
96,041
|
11.3
|
||||||||||
Northeast |
281,552
|
25.9
|
324,477
|
31.5
|
346,704 |
40.9
|
|||||||||||||
South
|
|
219,978
|
20.3
|
|
|
231,133
|
22.4
|
|
|
168,803
|
19.9
|
|
|||||||
Southeast |
244,233
|
22.5
|
176,088
|
17.1
|
167,925
|
19.8
|
|||||||||||||
West
|
281,399
|
25.9
|
|
205,480
|
20.0
|
|
69,124
|
8.1
|
|
||||||||||
Total
|
$ | 1,085,888 |
100.0
|
|
$
|
1,030,109
|
100.0
|
|
$
|
848,597
|
100.0
|
|
|||||||
Revenue
by Market Sector:
|
|||||||||||||||||||
Public
sector
|
$
|
1,058,746
|
97.5
|
|
$
|
995,707
|
96.7
|
|
$
|
800,605
|
94.3
|
|
|||||||
Private
sector
|
27,042
|
2.5
|
|
31,765
|
3.1
|
|
46,839
|
5.5
|
|
||||||||||
Material
sales
|
100 | - | 2,637 | 0.2 | 1,153 | 0.2 | |||||||||||||
Total
|
$ | 1,085,888 |
100.0
|
|
$
|
1,030,109
|
100.0
|
|
$
|
848,597
|
100.0
|
|
|||||||
Revenue
by Contract Type:
|
|||||||||||||||||||
Fixed
unit price
|
$
|
243,103
|
22.4
|
|
$
|
323,048
|
31.4
|
|
$
|
338,790
|
39.9
|
|
|||||||
Fixed
price, including design/build
|
842,666
|
77.6
|
|
704,424
|
68.4
|
|
508,654
|
59.9
|
|
||||||||||
Other
|
119
|
-
|
|
2,637
|
0.2
|
|
1,153
|
0.2
|
|
||||||||||
Total
|
$ | 1,085,888 |
100.0
|
|
$
|
1,030,109
|
100.0
|
|
$
|
848,597
|
100.0
|
|
Total
Backlog
|
|
||||||||||||
December
31,
|
2006
|
2005
|
|||||||||||
(in
thousands)
|
Amount
|
Percent
|
Amount
|
Percent
|
|||||||||
Backlog
by Division:
|
|||||||||||||
Branch
Division
|
$
|
807,648
|
35.8
|
|
$
|
728,256
|
31.2
|
|
|||||
Heavy
Construction Division
|
1,448,939
|
64.2
|
|
1,603,284
|
68.8
|
|
|||||||
Total
|
$ | 2,256,587 |
100.0
|
|
$
|
2,331,540
|
100.0
|
|
Branch Division Backlog | |||||||||||||
December 31, |
2006
|
2005
|
|||||||||||
(in thousands) |
Amount
|
Percent
|
Amount
|
Percent
|
|||||||||
California:
|
|||||||||||||
Public
sector
|
$ |
423,542
|
84.2
|
|
$ |
266,767
|
66.7
|
|
|||||
Private
sector
|
79,718
|
15.8
|
|
133,202
|
33.3
|
|
|||||||
Total
|
$ | 503,260 |
100.0
|
|
$ |
399,969
|
100.0
|
|
|||||
West
(excluding California):
|
|||||||||||||
Public
sector
|
$ |
230,230
|
75.6
|
|
$ |
270,687
|
82.5
|
|
|||||
Private
sector
|
74,158
|
24.4
|
|
57,600
|
17.5
|
|
|||||||
Total
|
$ | 304,388 |
100.0
|
|
$ |
328,287
|
100.0
|
|
|||||
Total Branch Division backlog: | |||||||||||||
Public
sector
|
$ | 653,772 | 80.9 | $ | 537,454 | 73.8 | |||||||
Private
sector
|
153,876 | 19.1 | 190,802 | 26.2 | |||||||||
Total
Branch Division backlog
|
$ | 807,648 | 100.0 | $ | 728,256 | 100.0 |
HCD
Backlog
|
|||||||||||||
December 31, |
2006
|
2005
|
|||||||||||
(in thousands) |
Amount
|
Percent
|
Amount
|
Percent
|
|||||||||
Backlog
by Geographic Area:
|
|||||||||||||
Midwest | $ |
443,909
|
30.6
|
$ |
76,464
|
4.8
|
|||||||
Northeast | 248,605 |
17.2
|
491,944
|
30.7
|
|||||||||
South
|
214,809
|
14.8
|
|
354,400
|
22.1
|
|
|||||||
Southeast
|
272,881
|
18.8
|
224,549
|
14.0
|
|||||||||
West
|
268,735
|
18.6
|
|
455,927
|
28.4
|
|
|||||||
Total
|
$ | 1,448,939 |
100.0
|
|
$
|
1,603,284
|
100.0
|
|
|||||
Backlog
by Market Sector:
|
|||||||||||||
Public
sector
|
$
|
1,413,778
|
97.6
|
|
$
|
1,546,370
|
96.5
|
|
|||||
Private
sector
|
35,161
|
2.4
|
|
56,914
|
3.5
|
|
|||||||
Total
|
$ | 1,448,939 |
100.0
|
|
$
|
1,603,284
|
100.0
|
|
|||||
Backlog
by Contract Type:
|
|||||||||||||
Fixed
unit price
|
$
|
171,239
|
11.8 |
|
$
|
391,494
|
24.4
|
|
|||||
Fixed
price including design/build
|
1,277,700
|
88.2
|
|
1,211,790
|
75.6
|
|
|||||||
Total
|
$ | 1,448,939 |
100.0
|
|
$
|
1,603,284
|
100.0
|
|
|
||||||||||
Years
ended December 31,
|
2006
|
2005
|
2004
|
|||||||
(in thousands) | ||||||||||
Branch
Division gross profit
|
$
|
364,878
|
$
|
253,890
|
$
|
185,509
|
||||
Percent
of division revenue
|
19.7
|
%
|
16.0
|
%
|
14.4
|
%
|
||||
Heavy
Construction Division gross profit
|
$
|
(86,856
|
) |
$
|
50,470
|
$
|
41,036
|
|||
Percent
of division revenue
|
(8.0 |
)%
|
4.9
|
%
|
4.8
|
%
|
||||
Other
|
$
|
17,698
|
$
|
15,012
|
|
$
|
(4,524
|
)
|
||
Total
gross profit
|
$
|
295,720
|
$
|
319,372
|
$
|
222,021
|
||||
Percent
of revenue
|
10.0
|
%
|
12.1
|
%
|
10.4
|
%
|
Revenue
from Contracts with Deferred Profit
|
||||||||||
Years
ended December 31,
|
2006
|
2005
|
2004
|
|||||||
(in thousands) | ||||||||||
Branch
Division
|
$
|
22,227
|
$
|
19,457
|
$
|
21,085
|
||||
Heavy
Construction Division
|
|
19,038
|
|
56,655
|
|
111,126
|
||||
Total
revenue from contracts with deferred profit
|
$ | 41,265 | $ | 76,112 | $ | 132,211 |
|
||||||||||
Years
ended December 31,
|
2006
|
2005
|
2004
|
|||||||
(in
thousands)
|
|
|||||||||
Salaries
and related expenses
|
$
|
102,935
|
$
|
94,901
|
$
|
84,490
|
||||
Incentive
compensation, discretionary profit sharing and other variable
compensation
|
33,094
|
28,294
|
23,356
|
|||||||
Other
general and administrative expenses
|
68,252
|
60,197
|
49,189
|
|||||||
Total
|
$
|
204,281
|
$
|
183,392
|
$
|
157,035
|
||||
Percent
of revenue
|
6.9
|
%
|
6.9
|
%
|
7.4
|
%
|
|
||||||||||
Years
ended December 31,
|
2006
|
2005
|
2004
|
|||||||
(in
thousands)
|
|
|||||||||
Provision
for (reversal
of) legal judgment
|
$
|
(4,800
|
) |
$
|
9,300
|
$
|
-
|
|
||||||||||
Years
ended December 31,
|
2006
|
2005
|
2004
|
|||||||
(in
thousands)
|
|
|||||||||
Goodwill
impairment charge
|
$
|
18,011
|
$
|
-
|
$
|
-
|
|
||||||||||
Years
ended December 31,
|
2006
|
2005
|
2004
|
|||||||
(in
thousands)
|
|
|||||||||
Gain
on sales of property and equipment
|
$
|
10,408
|
$
|
8,235
|
$
|
18,566
|
|
||||||||||
Years ended December 31, |
2006
|
2005
|
2004
|
|||||||
(in thousands) |
|
|||||||||
Interest
income
|
$ |
24,112
|
$ |
11,573
|
$ |
7,962
|
||||
Interest
expense
|
(4,492
|
) |
(6,932
|
)
|
(7,191
|
)
|
||||
Equity
in income of affiliates
|
2,157
|
1,497
|
6,162
|
|||||||
Other,
net
|
2,604
|
1,258
|
4,439
|
|||||||
Total
|
$ |
24,381
|
$ |
7,396
|
$ |
11,372
|
|
||||||||||
Years
ended December 31,
|
2006
|
2005
|
2004
|
|||||||
(in
thousands)
|
|
|||||||||
Provision
for income taxes
|
$
|
38,678
|
$
|
41,413
|
$
|
28,477
|
||||
Effective
tax rate
|
34.2
|
%
|
29.1
|
%
|
30.0
|
%
|
|
||||||||||
Years
ended December 31,
|
2006
|
2005
|
2004
|
|||||||
(in
thousands)
|
|
|||||||||
Minority
interest in consolidated subsidiaries
|
$
|
6,170
|
$
|
(17,748
|
)
|
$
|
(9,440
|
)
|
|
||||||||||
December
31,
|
2006
|
2005
|
2004
|
|||||||
(in thousands) |
|
|||||||||
Cash
and cash equivalents excluding consolidated joint ventures
|
$
|
110,913
|
$
|
147,525
|
$
|
93,830
|
||||
Consolidated joint venture cash and cash equivalents | 93,980 | 52,356 | 67,797 | |||||||
Total
consolidated cash and cash equivalents
|
$ | 204,893 | $ | 199,881 | $ | 161,627 | ||||
Net
cash provided by (used in):
|
||||||||||
Operating
activities
|
$ |
259,643
|
$ |
146,501
|
$ |
79,233
|
||||
Investing
activities
|
(183,683
|
) |
(64,785
|
)
|
(41,427
|
)
|
||||
Financing
activities
|
(70,948
|
) |
(43,462
|
)
|
(15,812
|
)
|
||||
Capital
expenditures
|
116,238
|
102,829
|
89,636
|
|||||||
Working
capital
|
319,762
|
367,801
|
355,927
|
Contractual Obligations |
Payments
due by period
|
|||||||||||||||
(in thousands) |
Total
|
Less
than 1 year
|
1-3
years
|
3-5
years
|
More
than 5 years
|
|||||||||||
Long
term debt (1)
|
$
|
107,236
|
$
|
28,660
|
$
|
37,460
|
$
|
23,667
|
$
|
17,449
|
||||||
Operating
leases (2)
|
42,707
|
11,702
|
7,094
|
5,529
|
18,382
|
|||||||||||
Purchase
obligations under construction contracts (3)
|
1,196,732
|
834,101
|
322,047
|
40,584
|
-
|
|||||||||||
Other
purchase obligations (4)
|
22,802
|
18,335
|
2,071
|
129
|
2,267
|
|||||||||||
Deferred
compensation obligations (5)
|
28,154
|
1,340
|
4,557
|
8,625
|
13,632
|
|||||||||||
Wilder
stock repurchase obligation (6)
|
19,680
|
1,420
|
1,464
|
5,260
|
11,536
|
|||||||||||
Total
|
$
|
1,417,311
|
$
|
895,558
|
$
|
374,693
|
$
|
83,794
|
$
|
63,266
|
QUARTERLY
FINANCIAL DATA
|
|||||||||||||
(unaudited - in thousands, except per share data) | |||||||||||||
2006
Quarters Ended
|
December
31
|
September
30
|
June
30
|
March
31
|
|||||||||
Revenue
|
$
|
719,927
|
$
|
941,672
|
$
|
812,037
|
$
|
495,968
|
|||||
Gross
profit
|
56,443
|
105,932
|
93,110
|
40,235
|
|||||||||
As
a percent of revenue
|
7.8
|
%
|
11.2
|
%
|
11.5
|
%
|
8.1
|
%
|
|||||
Net
income (loss)
|
2,917
|
45,725
|
33,289
|
(1,422
|
)
|
||||||||
As
a percent of revenue
|
0.4
|
%
|
4.9
|
%
|
4.1
|
%
|
(0.3
|
)%
|
|||||
Net
income (loss) per share:
|
|||||||||||||
Basic
|
$ |
0.07
|
$
|
1.12
|
$
|
0.81
|
$
|
(0.03
|
)
|
||||
Diluted
|
$ |
0.07
|
$
|
1.10
|
$
|
0.80
|
$
|
(0.03
|
)
|
||||
Dividends
per share
|
$
|
0.10
|
$
|
0.10
|
$
|
0.10
|
$
|
0.10
|
|||||
Market
price of common stock
|
|||||||||||||
High
|
$ |
63.73
|
$ |
56.14
|
$ |
51.65
|
$ |
49.75
|
|||||
Low
|
$ |
47.69
|
$ |
37.35
|
$ |
37.63
|
$ |
35.42
|
|||||
2005
Quarters Ended
|
December
31
|
September
30
|
June
30
|
March
31
|
|||||||||
Revenue
|
$
|
679,552
|
$
|
864,162
|
$
|
676,704
|
$
|
420,934
|
|||||
Gross
profit
|
|
106,024
|
|
109,701
|
|
76,707
|
|
26,940
|
|||||
As
a percent of revenue
|
15.6
|
%
|
12.7
|
%
|
11.3
|
%
|
6.4
|
%
|
|||||
Net
income (loss)
|
35,812
|
40,651
|
14,954
|
(8,267
|
)
|
||||||||
As
a percent of revenue
|
5.3
|
%
|
4.7
|
%
|
2.2
|
%
|
(2.0
|
)%
|
|||||
Net
income (loss) per share:
|
|||||||||||||
Basic
|
$
|
0.88
|
$
|
1.00
|
$
|
0.37
|
$
|
(0.20
|
)
|
||||
Diluted
|
$
|
0.86
|
$
|
0.98
|
$
|
0.36
|
$
|
(0.20
|
)
|
||||
Dividends
per share
|
$
|
0.10
|
$
|
0.10
|
$
|
0.10
|
$
|
0.10
|
|||||
Market
price of common stock
|
|||||||||||||
High
|
$
|
39.88
|
$
|
38.42
|
$
|
28.20
|
$
|
28.15
|
|||||
Low
|
$
|
31.50
|
$
|
27.97
|
$
|
22.00
|
$
|
24.01
|
2007
|
2008
|
2009
|
2010
|
2011
|
Thereafter
|
Total
|
||||||||||||||||
Assets
|
||||||||||||||||||||||
Cash,
cash equivalents and held-to-maturity investments
|
$
|
312,952
|
$
|
42,555
|
$
|
2,199
|
$
|
4,194
|
$
|
-
|
$
|
-
|
$
|
361,900
|
||||||||
Weighted
average interest rate
|
4.98
|
%
|
5.05
|
%
|
3.64
|
%
|
5.36
|
%
|
-
|
%
|
-
|
%
|
4.98
|
%
|
||||||||
Liabilities
|
||||||||||||||||||||||
Fixed rate debt
|
||||||||||||||||||||||
Senior notes payable
|
$
|
15,000
|
$
|
15,000
|
$
|
15,000
|
$
|
15,000
|
$
|
8,333
|
$
|
16,667
|
$
|
85,000
|
||||||||
Weighted average interest rate
|
6.77
|
%
|
6.77
|
%
|
6.77
|
%
|
6.77
|
%
|
6.96
|
%
|
6.96
|
%
|
6.83
|
%
|
||||||||
Schedule
|
Page
|
Report
of Independent Registered Public Accounting Firm
|
F-1
|
Consolidated
Balance Sheets at December 31, 2006 and 2005
|
F-2
|
Consolidated
Statements of Income for the Years Ended December 31, 2006, 2005
and
2004
|
F-3
|
Consolidated
Statements of Shareholders’ Equity and Comprehensive Income for the Years
Ended December
31, 2006, 2005 and 2004
|
F-4
|
Consolidated
Statements of Cash Flows for the Years Ended December
31, 2006, 2005 and 2004
|
F-5
|
Notes
to the Consolidated Financial Statements
|
F-6
to F-26
|
Schedule
|
Page
|
Schedule
II - Schedule of Valuation and Qualifying Accounts
|
S-1
|
GRANITE
CONSTRUCTION INCORPORATED
|
|||||||
CONSOLIDATED
BALANCE SHEETS
|
|||||||
(in
thousands, except share and per share
data)
|
|||||||
December 31, |
2006
|
2005
|
|||||
ASSETS
|
|||||||
Current
assets
|
|||||||
Cash
and cash equivalents
|
$
|
204,893
|
$
|
199,881
|
|||
Short-term
marketable securities
|
141,037
|
68,540
|
|||||
Accounts
receivable, net
|
492,229
|
476,453
|
|||||
Costs
and estimated earnings in excess of billings
|
15,797
|
43,660
|
|||||
Inventories
|
41,529
|
33,161
|
|||||
Real estate held for sale | 55,888 | 46,889 | |||||
Deferred
income taxes
|
36,776
|
22,996
|
|||||
Equity
in construction joint ventures
|
31,912
|
27,408
|
|||||
Other
current assets
|
63,144
|
57,960
|
|||||
Total
current assets
|
1,083,205
|
976,948
|
|||||
Property
and equipment, net
|
429,966
|
397,111
|
|||||
Long-term
marketable securities
|
48,948
|
32,960
|
|||||
Investments
in affiliates
|
21,471
|
15,855
|
|||||
Other
assets
|
49,248
|
49,356
|
|||||
Total
assets
|
$ | 1,632,838 |
$
|
1,472,230
|
|||
LIABILITIES
AND SHAREHOLDERS’ EQUITY
|
|||||||
Current
liabilities
|
|||||||
Current
maturities of long-term debt
|
$
|
28,660
|
$
|
26,888
|
|||
Accounts
payable
|
257,612
|
232,807
|
|||||
Billings
in excess of costs and estimated earnings
|
287,843
|
208,883
|
|||||
Accrued
expenses and other current liabilities
|
189,328
|
140,569
|
|||||
Total
current liabilities
|
763,443
|
609,147
|
|||||
Long-term
debt
|
78,576
|
124,415
|
|||||
Other
long-term liabilities
|
58,419
|
46,556
|
|||||
Deferred
income taxes
|
22,324
|
37,325
|
|||||
Commitments
and contingencies
|
|||||||
Minority
interest in consolidated subsidiaries
|
15,532
|
33,227
|
|||||
Shareholders’
equity
|
|||||||
Preferred
stock, $0.01 par value, authorized 3,000,000 shares, none
outstanding
|
-
|
-
|
|||||
Common
stock, $0.01 par value, authorized 150,000,000 shares in 2006 and
100,000,000 shares in 2005; issued and outstanding 41,833,559 in 2006
and 41,682,010 in 2005
|
418
|
417
|
|||||
Additional
paid-in capital
|
78,620
|
80,619
|
|||||
Retained
earnings
|
612,875
|
549,101
|
|||||
Accumulated
other comprehensive income
|
2,631
|
1,602
|
|||||
Unearned
compensation
|
-
|
(10,179
|
)
|
||||
Total
shareholders’ equity
|
694,544 |
621,560
|
|||||
Total
liabilities and shareholders’ equity
|
$ | 1,632,838 |
$
|
1,472,230
|
GRANITE
CONSTRUCTION INCORPORATED
|
||||||||||
CONSOLIDATED
STATEMENTS OF INCOME
|
||||||||||
(in
thousands, except per share data)
|
||||||||||
Years
Ended December 31,
|
2006
|
2005
|
2004
|
|||||||
Revenue
|
||||||||||
Construction
|
$ |
2,559,445
|
$
|
2,307,062
|
$
|
1,871,859
|
||||
Material
sales
|
410,159
|
334,290
|
264,353
|
|||||||
Total
revenue
|
2,969,604
|
2,641,352
|
2,136,212
|
|||||||
Cost
of revenue
|
||||||||||
Construction
|
2,360,555
|
2,060,680
|
1,701,277
|
|||||||
Material
sales
|
313,329
|
261,300
|
212,914
|
|||||||
Total
cost of revenue
|
2,673,884
|
2,321,980
|
1,914,191
|
|||||||
Gross
Profit
|
295,720
|
319,372
|
222,021
|
|||||||
General
and administrative expenses
|
204,281
|
183,392
|
157,035
|
|||||||
Provision
for (reversal of) legal judgment
|
(4,800
|
) |
9,300
|
-
|
||||||
Goodwill impairment charge | 18,011 | - | - | |||||||
Gain
on sales of property and equipment
|
10,408
|
8,235
|
18,566
|
|||||||
Operating
income
|
88,636
|
134,915
|
83,552
|
|||||||
Other
income (expense)
|
||||||||||
Interest
income
|
24,112
|
11,573
|
7,962
|
|||||||
Interest
expense
|
(4,492
|
) |
(6,932
|
)
|
(7,191
|
)
|
||||
Equity
in income of affiliates
|
2,157
|
1,497
|
6,162
|
|||||||
Other,
net
|
2,604
|
1,258
|
4,439
|
|||||||
Total
other income (expense)
|
24,381 |
7,396
|
11,372
|
|||||||
Income
before provision for income taxes and minority
interest
|
113,017
|
142,311
|
94,924
|
|||||||
Provision
for income taxes
|
38,678
|
41,413
|
28,477
|
|||||||
Income
before minority interest
|
74,339
|
100,898
|
66,447
|
|||||||
Minority
interest in consolidated subsidiaries
|
6,170
|
(17,748
|
)
|
(9,440
|
)
|
|||||
Net
income
|
$ |
80,509
|
$ |
83,150
|
$ |
57,007
|
||||
Net
income per share
|
||||||||||
Basic
|
$
|
1.97
|
$
|
2.05
|
$
|
1.41
|
||||
Diluted
|
$
|
1.94
|
$
|
2.02
|
$
|
1.39
|
||||
Weighted
average shares of common stock
|
||||||||||
Basic
|
40,874
|
40,614
|
40,390
|
|||||||
Diluted
|
41,471
|
41,249
|
41,031
|
|||||||
Dividends
per share
|
$
|
0.40
|
$
|
0.40
|
$
|
0.40
|
GRANITE
CONSTRUCTION INCORPORATED
|
||||||||||||||||||||||
CONSOLIDATED
STATEMENTS OF SHAREHOLDERS’ EQUITY AND COMPREHENSIVE
INCOME
|
||||||||||||||||||||||
(in
thousands, except share data)
|
||||||||||||||||||||||
Years
Ended December 31,
2004,
2005 and 2006
|
Outstanding
Shares
|
Common
Stock
|
Additional
Paid-in Capital
|
Retained
Earnings
|
Accumulated
Other Comprehensive Income (loss)
|
Unearned
Compensation
|
Total
|
|||||||||||||||
Balances,
December 31, 2003
|
41,528,317
|
$
|
415
|
$
|
73,651
|
$
|
442,272
|
$
|
76
|
|
$
|
(11,523
|
)
|
$
|
504,891
|
|||||||
Comprehensive
income:
|
||||||||||||||||||||||
Net
income
|
-
|
-
|
-
|
57,007
|
-
|
-
|
||||||||||||||||
Other
comprehensive income:
|
||||||||||||||||||||||
Changes
in net unrealized gains on investments
|
-
|
-
|
-
|
-
|
1,399
|
-
|
||||||||||||||||
Total
comprehensive income
|
58,406
|
|||||||||||||||||||||
Restricted
stock issued
|
166,650
|
2
|
4,367
|
-
|
-
|
(5,306
|
)
|
(937
|
)
|
|||||||||||||
Amortized
restricted stock
|
-
|
-
|
-
|
-
|
-
|
6,011
|
6,011
|
|||||||||||||||
Repurchase
of common stock
|
(293,239
|
)
|
(3
|
)
|
(6,424
|
)
|
-
|
-
|
-
|
(6,427
|
)
|
|||||||||||
Cash
dividends on common stock
|
-
|
-
|
-
|
(16,644
|
)
|
-
|
-
|
(16,644
|
)
|
|||||||||||||
Common stock contributed to ESOP |
192,000
|
2 |
3,987
|
- | - | - |
3,989
|
|||||||||||||||
Excess
tax benefit on stock-based compensation
|
- | - | 703 | - | - | - | 703 | |||||||||||||||
Stock
options exercised and other
|
18,591
|
-
|
482
|
-
|
-
|
-
|
482
|
|||||||||||||||
Balances,
December 31, 2004
|
41,612,319
|
416
|
76,766
|
482,635
|
1,475
|
(10,818
|
)
|
550,474
|
||||||||||||||
Comprehensive
income:
|
||||||||||||||||||||||
Net
income
|
-
|
-
|
-
|
83,150
|
-
|
-
|
||||||||||||||||
Other
comprehensive income:
|
||||||||||||||||||||||
Changes
in net unrealized gains on investments
|
-
|
-
|
-
|
-
|
127
|
-
|
||||||||||||||||
Total
comprehensive income
|
83,277
|
|||||||||||||||||||||
Restricted
stock issued
|
187,563
|
2
|
5,019
|
-
|
-
|
(5,318
|
)
|
(297
|
)
|
|||||||||||||
Amortized
restricted stock
|
-
|
-
|
-
|
-
|
-
|
5,957
|
5,957
|
|||||||||||||||
Repurchase
of common stock
|
(204,543
|
)
|
(2
|
)
|
(5,261
|
)
|
-
|
-
|
-
|
(5,263
|
)
|
|||||||||||
Cash
dividends on common stock
|
- |
-
|
-
|
(16,684
|
)
|
-
|
-
|
(16,684
|
)
|
|||||||||||||
Common
stock contributed to ESOP
|
85,200
|
1
|
1,993
|
-
|
-
|
-
|
1,994
|
|||||||||||||||
Excess
tax benefit on stock-based compensation
|
- | - | 1,723 | - | - | - | 1,723 | |||||||||||||||
Stock
options exercised and other
|
1,471
|
-
|
379
|
-
|
-
|
-
|
379
|
|||||||||||||||
Balances,
December 31, 2005
|
41,682,010
|
417
|
80,619
|
549,101
|
1,602
|
(10,179
|
)
|
621,560
|
||||||||||||||
Comprehensive
income:
|
||||||||||||||||||||||
Net
income
|
-
|
-
|
-
|
80,509
|
-
|
-
|
||||||||||||||||
Other
comprehensive income:
|
||||||||||||||||||||||
Changes
in net unrealized gains on investments
|
-
|
-
|
-
|
-
|
1,029
|
-
|
||||||||||||||||
Total
comprehensive income
|
81,538
|
|||||||||||||||||||||
Reclassification
of unearned compensation on non-vested restricted stock balance
upon
adoption of SFAS 123-R
|
- | - | (10,179 | ) | - | - | 10,179 | - | ||||||||||||||
Restricted
stock issued
|
202,730
|
2
|
(2
|
) |
-
|
-
|
-
|
-
|
||||||||||||||
Amortized
restricted stock
|
-
|
-
|
7,572
|
-
|
-
|
-
|
7,572
|
|||||||||||||||
Repurchase
of common stock
|
(159,285
|
) |
(2
|
) |
(7,373
|
) |
-
|
-
|
-
|
(7,375
|
) | |||||||||||
Cash
dividends on common stock
|
- |
-
|
-
|
(16,735
|
) |
-
|
-
|
(16,735
|
) | |||||||||||||
Common
stock contributed to ESOP
|
45,300
|
-
|
1,995
|
-
|
-
|
-
|
1,995
|
|||||||||||||||
Excess
tax benefit on stock-based compensation
|
- | - | 3,390 | - | - | - | 3,390 | |||||||||||||||
Stock
options exercised and other
|
62,804
|
1
|
2,598 |
-
|
-
|
-
|
2,599
|
|||||||||||||||
Balances,
December 31, 2006
|
41,833,559
|
$
|
418
|
$
|
78,620
|
$
|
612,875
|
$
|
2,631
|
$
|
-
|
$
|
694,544
|
Years
Ended December 31,
|
2006
|
2005
|
2004
|
|||||||
Operating
Activities
|
||||||||||
Net
income
|
$
|
80,509
|
$
|
83,150
|
$
|
57,007
|
||||
Adjustments
to reconcile net income to net cash provided by operating
activities:
|
||||||||||
Goodwill
impairment charge
|
18,011 | - | - | |||||||
Depreciation,
depletion and amortization
|
69,180
|
65,801
|
62,459
|
|||||||
Gain
on sales of property and equipment
|
(10,408
|
) |
(8,235
|
)
|
(18,566
|
)
|
||||
Change
in deferred income taxes
|
(29,462
|
) |
(8,839
|
)
|
(5,868
|
) | ||||
Stock-based compensation
|
7,572
|
5,957
|
6,011
|
|||||||
Excess
tax benefit on stock-based compensation
|
(3,390 | ) |
-
|
-
|
||||||
Common
stock contributed to ESOP
|
1,995
|
1,994
|
3,989
|
|||||||
Minority
interest in consolidated subsidiaries
|
(6,170
|
) |
17,748
|
9,440
|
||||||
Equity
in income of affiliates
|
(2,157
|
) |
(1,497
|
)
|
(6,162
|
)
|
||||
Gain
on sale of equity investment
|
-
|
(1,187
|
)
|
(3,288
|
)
|
|||||
Changes
in assets and liabilities, net of the effects of acquisitions and
FIN 46
consolidations:
|
||||||||||
Accounts
receivable, net
|
(18,905
|
) |
(115,255
|
)
|
(28,222
|
)
|
||||
Inventories
|
(8,368
|
) |
(1,450
|
)
|
(1,833
|
) | ||||
Real
estate held for sale
|
(10,289 | ) |
(13,071
|
) |
(20,345
|
) | ||||
Equity
in construction joint ventures
|
(4,504
|
) |
(6,513
|
)
|
(208
|
)
|
||||
Other
assets
|
(10,073
|
) |
(16,061
|
)
|
(3,354
|
)
|
||||
Accounts
payable
|
24,805
|
41,025
|
38,431
|
|||||||
Billings
in excess of costs and estimated earnings, net
|
106,823
|
75,206
|
|
(25,037
|
) | |||||
Accrued
expenses and other liabilities
|
54,474
|
27,728
|
14,779
|
|||||||
Net
cash provided by operating activities
|
259,643
|
146,501
|
79,233
|
|||||||
Investing
Activities
|
||||||||||
Purchases
of marketable securities
|
(233,868
|
) |
(96,877
|
)
|
(96,975
|
)
|
||||
Maturities
and sales of marketable securities
|
153,024
|
111,975
|
113,243
|
|||||||
Additions
to property and equipment
|
(116,238
|
) |
(102,829
|
)
|
(89,636
|
)
|
||||
Proceeds
from sales of property and equipment
|
16,398
|
25,012
|
24,389
|
|||||||
Proceeds
from sales of equity investment
|
-
|
1,759
|
7,463
|
|||||||
Contributions
to affiliates
|
(6,982
|
) |
(5,405
|
) |
(2,552
|
) | ||||
Distributions
from affiliates
|
1,970 |
669
|
11,860
|
|||||||
Other
investing activities
|
2,013
|
911
|
(9,219
|
) | ||||||
Net
cash used in investing activities
|
(183,683
|
) |
(64,785
|
)
|
(41,427
|
)
|
||||
Financing
Activities
|
||||||||||
Proceeds
from long-term debt
|
56,869
|
29,100
|
70,703
|
|||||||
Repayments
of long-term debt
|
(92,873
|
) |
(44,498
|
)
|
(52,142
|
)
|
||||
Repurchase
of common stock
|
(7,375
|
) |
(5,263
|
)
|
(6,427
|
)
|
||||
Dividends
paid
|
(16,722
|
) |
(16,675
|
)
|
(16,636
|
)
|
||||
Contributions
from minority partners
|
6,171
|
946
|
5,601
|
|||||||
Distributions
to minority partners
|
(23,007
|
) |
(7,451
|
)
|
(17,229
|
)
|
||||
Excess
tax benefit on stock-based compensation
|
3,390 |
-
|
-
|
|||||||
Stock
options and other financing activities
|
2,599 |
379
|
318
|
|||||||
Net
cash used in financing activities
|
(70,948
|
) |
(43,462
|
)
|
(15,812
|
)
|
Increase in
cash and cash equivalents
|
$ |
5,012
|
$ |
38,254
|
$ |
21,994
|
||||
Cash and cash equivalent added in FIN 46 consolidations |
-
|
-
|
69,714
|
|||||||
Cash and cash equivalents at beginning of year |
199,881
|
161,627
|
69,919
|
|||||||
Cash and cash equivalents at end of year | $ |
204,893
|
$ |
199,881
|
$ |
161,627
|
||||
Supplementary
Information
|
||||||||||
Cash
paid during the period for:
|
||||||||||
Interest
|
$
|
5,009
|
$
|
6,801
|
$
|
7,000
|
||||
Income
taxes
|
79,511
|
49,551
|
29,557
|
|||||||
Non-cash
investing and financing activity:
|
||||||||||
Restricted
stock issued for services, net
|
$
|
9,774
|
$
|
5,021
|
$
|
4,369
|
||||
Dividends
accrued but not paid
|
4,184
|
4,170
|
4,161
|
|||||||
Financed
acquisition of assets
|
5,335
|
2,337
|
14,680
|
|||||||
Notes
received from sale of assets
|
-
|
-
|
8,893
|
|||||||
Debt
repayments from sale of assets
|
13,398 | - | - | |||||||
The
accompanying notes are an integral part of these consolidated financial
statements.
|
Years
Ended December 31,
|
2006
|
2005
|
2004
|
|||||||
Reduction
in gross profit from projects with downward estimate
changes
|
$
|
(175.0 | ) | $ | (62.0 | ) | $ | (51.0 | ) | |
Increase
in gross profit from projects with upward estimate changes
|
|
30.0
|
|
31.0
|
|
11.0
|
||||
Net
reduction in gross profit
|
$ |
(145.0
|
) | $ |
(31.0
|
) | $ |
(40.0
|
) | |
Number
of projects with significant downward estimate changes*
|
19
|
13
|
10
|
|||||||
Range
of reduction to gross profit from each project**
|
$ |
1.0
- 49.0
|
$ |
2.0
- 8.0
|
$ |
1.0
- 12.0
|
||||
Number
of projects with significant upward estimate changes*
|
9
|
4
|
3
|
|||||||
Range
of increase to gross profit from each project**
|
$ |
1.0
- 7.0
|
$ |
1.0
- 12.0
|
$ |
2.0
- 8.0
|
||||
*
Significant is defined as a change with a net gross margin impact
of $1.0 million or greater.
**
The reduction in gross profit from each project is net of any
increase in the respective periods. The increase in gross profit
from each project is net of any reduction in the respective
periods.
|
|
Number
of Projects
|
Total Contract
Value
|
2006
Gross Profit Reduction Impact
|
HCD
Backlog at December 31, 2006
|
Percent
of Total HCD Backlog at December 31, 2006
|
|||||||||||
Projects
either complete or greater than 90% complete with gross profit
impact less
than $20.0 million
|
9
|
$
|
556.0
|
$
|
18.0
|
$
|
13.0
|
0.9
|
||||||||
Projects
between 65% and 90% complete with gross profit impact less
than $20.0
million
|
6
|
787.0
|
69.0
|
164.0
|
11.3
|
|||||||||||
Projects
between 25% and 55% complete with gross profit impact less
than $20.0
million
|
2
|
123.0
|
13.0
|
71.0
|
4.9
|
|||||||||||
Highway
project in Oregon - 29% complete
|
1
|
130.0
|
22.0
|
83.0
|
5.7
|
|||||||||||
Highway
project in California - 87% complete
|
1
|
447.0
|
49.0
|
57.0
|
4.0
|
|||||||||||
Total
for projects with significant downward changes
|
19
|
$
|
2,043.0
|
$
|
171.0
|
$
|
388.0
|
26.8
|
||||||||
All
other projects with backlog greater than $5.0 million with
no significant
downward changes
|
13
|
|
$
|
1,042.00
|
71.9
|
Held-to-Maturity
|
Available-for-Sale
|
Total
|
|||||||||||||||||
2006
|
2005
|
2006
|
2005
|
2006
|
2005
|
||||||||||||||
Securities
classified as current:
|
|||||||||||||||||||
U.S.
Government and agency obligations
|
$
|
34,529
|
$
|
6,540
|
$
|
-
|
$
|
-
|
$
|
34,529
|
$
|
6,540
|
|||||||
Commercial
paper
|
58,493
|
19,880
|
-
|
-
|
58,493
|
19,880
|
|||||||||||||
Municipal
bonds
|
15,037
|
16,094
|
-
|
-
|
15,037
|
16,094
|
|||||||||||||
Mutual
funds
|
-
|
- | 32,978 | 26,026 | 32,978 | 26,026 | |||||||||||||
Total
current marketable securities
|
108,059 |
42,514
|
32,978
|
26,026
|
141,037
|
68,540
|
|||||||||||||
Securities
classified as long-term:
|
|||||||||||||||||||
U.S.
Government and agency obligations
|
37,315
|
21,922
|
-
|
-
|
37,315
|
21,922
|
|||||||||||||
Municipal
bonds
|
11,633
|
11,038
|
-
|
-
|
11,633
|
11,038
|
|||||||||||||
Total
long-term marketable securities
|
48,948 |
32,960
|
-
|
-
|
48,948
|
32,960
|
|||||||||||||
Total
marketable securities
|
$ |
157,007
|
$ |
75,474
|
$ |
32,978
|
$ |
26,026
|
$ |
189,985
|
$ |
101,500
|
Within
one year
|
$
|
108,059
|
||
After
one year through five years
|
48,948
|
|||
Total
|
$
|
157,007
|
2006
|
2005
|
||||||||||||||||||
Held-to-Maturity
|
Available-for-Sale
|
Total
|
Held-to-Maturity
|
Available-for-Sale
|
Total
|
||||||||||||||
Purchases
|
$
|
228,626
|
$
|
5,242
|
$
|
233,868
|
$
|
90,110
|
$
|
6,767
|
$
|
96,877
|
|||||||
Maturities
and sales
|
(153,024
|
) |
-
|
(153,024
|
) |
(108,764
|
)
|
(3,211
|
)
|
(111,975
|
)
|
||||||||
Amortization
and other
|
5,931
|
-
|
5,931
|
361
|
|
-
|
361
|
|
|||||||||||
Unrealized
gains
|
-
|
1,710
|
1,710
|
-
|
172
|
172
|
|||||||||||||
Net
Change
|
$ |
81,533
|
$ |
6,952
|
$ |
88,485
|
$ |
(18,293
|
)
|
$ |
3,728
|
$ |
(14,565
|
)
|
|
|||||||
December
31,
|
2006
|
2005
|
|||||
Construction
contracts:
|
|||||||
Completed
and in progress
|
$
|
231,226
|
$
|
258,402
|
|||
Retentions
|
191,613
|
167,973
|
|||||
Total
construction contracts
|
422,839
|
426,375
|
|||||
Construction
material sales
|
47,082
|
43,232
|
|||||
Other
|
24,735
|
8,452
|
|||||
Total
gross accounts receivable
|
494,656
|
478,059
|
|||||
Less:
allowance for doubtful accounts
|
(2,427
|
) |
(1,606
|
) | |||
Total
net accounts receivable
|
$
|
492,229
|
$
|
476,453
|
|
|||||||
December
31,
|
2006
|
2005
|
|||||
Assets:
|
|||||||
Total
|
$
|
158,178
|
$
|
141,944
|
|||
Less
other partners’
interest
|
103,723
|
90,751
|
|||||
Company’s
interest
|
54,455
|
51,193
|
|||||
Liabilities:
|
|
||||||
Total
|
79,183
|
63,027
|
|||||
Less
other partners’
interest
|
56,640
|
39,242
|
|||||
Company’s
interest
|
22,543
|
23,785
|
|||||
Company’s
interest in net assets
|
$
|
31,912
|
$
|
27,408
|
|
||||||||||
December
31,
|
2006
|
2005
|
2004
|
|||||||
Revenue:
|
||||||||||
Total
|
$
|
349,945
|
$
|
228,180
|
$
|
229,265
|
||||
Less
other partners’
interest
|
239,045
|
152,980
|
159,631
|
|||||||
Company’s
interest
|
110,900
|
75,200
|
69,634
|
|||||||
Cost
of revenue:
|
||||||||||
Total
|
281,622
|
213,176
|
211,715
|
|||||||
Less
other partners’
interest
|
192,802
|
144,022
|
147,599
|
|||||||
Company’s
interest
|
88,820
|
69,154
|
64,116
|
|||||||
Company’s
interest in gross profit
|
$
|
22,080
|
$
|
6,046
|
$
|
5,518
|
December
31,
|
2006
|
2005
|
|||||
Equity
method investments in affiliates
|
$
|
17,298
|
$
|
11,680
|
|||
Cost
method investment in TIC
|
4,173
|
4,175
|
|||||
Total
investments in affiliates
|
$
|
21,471
|
$
|
15,855
|
December
31,
|
2006
|
2005
|
|||||
Balance
sheet data:
|
|
|
|||||
Current
assets
|
$ |
20,279
|
$ |
16,868
|
|||
Long-term
assets
|
107,562
|
94,371
|
|||||
Total
assets
|
127,841
|
111,239
|
|||||
Current
liabilities
|
17,433
|
5,827
|
|||||
Long-term
liabilities
|
73,208
|
73,846
|
|||||
Total
liabilities
|
90,641
|
79,673
|
|||||
Net
assets
|
$ |
37,200
|
$ |
31,566
|
|||
Company’s
interest in affiliates’ net assets
|
$ |
17,298
|
$ |
11,680
|
|
||||||||||
Years
Ended December 31,
|
2006
|
2005
|
2004
|
|||||||
Earnings
data:
|
||||||||||
Revenue
|
$
|
50,353
|
$
|
30,732
|
$
|
138,222
|
||||
Gross
profit
|
9,580
|
8,616
|
73,828
|
|||||||
Earnings
before taxes
|
3,158
|
2,170
|
60,301
|
|||||||
Net
income
|
3,158
|
2,170
|
60,301
|
|||||||
Company’s
interest in affiliates’ net income
|
2,157
|
1,497
|
6,162
|
|
|||||||
December
31,
|
2006
|
2005
|
|||||
Land
|
$
|
56,797
|
$
|
54,782
|
|||
Quarry
property
|
112,654
|
104,662
|
|||||
Buildings
and leasehold improvements
|
72,975
|
77,788
|
|||||
Equipment
and vehicles
|
804,370
|
746,014
|
|||||
Office
furniture and equipment
|
26,006
|
21,047
|
|||||
Gross
property and equipment
|
1,072,802
|
1,004,293
|
|||||
Less
accumulated depreciation and depletion
|
642,836
|
607,182
|
|||||
Net
property and equipment
|
$
|
429,966
|
$
|
397,111
|
|
|||||||
December
31,
|
2006
|
2005
|
|||||
Beginning
balance
|
$
|
11,901
|
$
|
11,496
|
|||
Liabilities
incurred and revisions to estimates
|
216
|
8
|
|||||
Liabilities
settled
|
(18
|
) |
(283
|
)
|
|||
Accretion
|
581
|
680
|
|||||
Ending
balance
|
$
|
12,680
|
$
|
11,901
|
December
31,
|
2006
|
2005
|
|||||
Goodwill
by segment:
|
|||||||
Heavy
Construction Division
|
$
|
-
|
$
|
18,011
|
|||
Branch
Division
|
9,900
|
9,900
|
|||||
Total
goodwill
|
$
|
9,900
|
$
|
27,911
|
December
31, 2006
|
||||||||||
Gross
Value
|
Accumulated
Amortization
|
Net
Value
|
||||||||
Amortized
intangible assets:
|
|
|
|
|||||||
Covenants
not to compete
|
$
|
161
|
$
|
(109
|
)
|
$
|
52
|
|||
Permits
|
2,000
|
(761
|
)
|
1,239
|
||||||
Trade
names
|
1,425 |
(768
|
)
|
657
|
||||||
Other
|
603
|
(193
|
)
|
410
|
||||||
Total
amortized intangible assets
|
$
|
4,189
|
$
|
(1,831
|
)
|
$
|
2,358
|
|||
|
December
31, 2005
|
|||||||||
|
Gross
Value
|
Accumulated
Amortization
|
Net
Value
|
|||||||
Amortized
intangible assets:
|
||||||||||
Covenants
not to compete
|
$
|
439
|
$ |
(383
|
)
|
$ |
56
|
|||
Permits
|
2,000
|
(628
|
)
|
1,372
|
||||||
Trade
names
|
1,425
|
(565
|
)
|
860
|
||||||
Other
|
200
|
(198
|
)
|
2
|
||||||
Total
amortized intangible assets
|
$
|
4,064
|
$ |
(1,774
|
)
|
$ |
2,290
|
December
31,
|
2006
|
2005
|
|||||
Payroll
and related employee benefits
|
$
|
53,956
|
$
|
47,206
|
|||
Accrued
insurance
|
37,582
|
43,396
|
|||||
Loss job reserves | 54,825 | 16,999 | |||||
Other
|
42,965
|
32,968
|
|||||
Total
|
$
|
189,328
|
$
|
140,569
|
December
31,
|
2006
|
2005
|
|||||
Senior
notes payable
|
$
|
85,000
|
$
|
100,000
|
|||
Bank
revolving line of credit
|
-
|
25,000
|
|||||
Mortgages
|
21,436
|
25,353
|
|||||
Other
notes payable
|
800 |
950
|
|||||
Total debt
|
107,236
|
151,303
|
|||||
Less
current maturities
|
28,660
|
26,888
|
|||||
Total long-term
debt
|
$
|
78,576
|
$
|
124,415
|
December
31,
|
2006
|
2005
|
2004
|
||||||||||||||||
|
Shares
|
Weighted-average
grant-date fair value per share
|
Shares
|
Weighted-average
grant-date fair value per share
|
Shares
|
Weighted-average
grant-date fair value per share
|
|||||||||||||
Restricted
shares outstanding, beginning balance
|
1,005
|
$ |
21.44
|
1,163
|
$ |
19.58
|
1,131
|
$ |
18.57
|
||||||||||
Restricted
shares granted
|
216
|
47.94
|
214
|
26.07
|
237
|
23.92
|
|||||||||||||
Restricted
shares vested
|
(331
|
) |
23.55
|
(343
|
) |
18.00
|
(147
|
) |
19.18
|
||||||||||
Restricted
shares forfeited
|
(13
|
) |
29.22
|
(29
|
) |
21.63
|
(58
|
) |
18.62
|
||||||||||
Restricted shares outstanding, ending balance
|
877
|
$ |
27.06
|
1,005
|
$ |
21.44
|
1,163
|
$ |
19.58
|
Years
Ended December 31,
|
2006
|
2005
|
2004
|
|||||||
Weighted
average shares outstanding:
|
||||||||||
Weighted
average common stock outstanding
|
41,803
|
41,678
|
41,580
|
|||||||
Less:
weighted average non-vested restricted stock outstanding
|
929
|
1,064
|
1,190
|
|||||||
Total
basic weighted average shares outstanding
|
40,874
|
40,614
|
40,390
|
|||||||
Diluted
weighted average shares outstanding:
|
||||||||||
Basic
weighted average shares outstanding
|
40,874
|
40,614
|
40,390
|
|||||||
Effect
of dilutive securities:
|
||||||||||
Common
stock options and units
|
46
|
70
|
52
|
|||||||
Restricted
stock
|
551
|
565
|
589
|
|||||||
Total
weighted average shares outstanding assuming dilution
|
41,471
|
41,249
|
41,031
|
Years
Ended December 31,
|
2006
|
2005
|
2004
|
|||||||
Federal:
|
||||||||||
Current
|
$
|
57,416
|
$
|
42,399
|
$
|
28,238
|
||||
Deferred
|
(26,444
|
) |
(7,682
|
)
|
(4,861
|
) | ||||
Total
federal
|
30,972
|
34,717
|
23,377
|
|||||||
State:
|
||||||||||
Current
|
10,724
|
7,853
|
6,107
|
|||||||
Deferred
|
(3,018
|
) |
(1,157
|
)
|
(1,007
|
) | ||||
Total
state
|
7,706
|
6,696
|
5,100
|
|||||||
Total provision
for income taxes
|
$
|
38,678
|
$
|
41,413
|
$
|
28,477
|
Years
Ended December 31,
|
2006
|
2005
|
2004
|
|||||||
Federal
statutory tax rate
|
35.0
|
%
|
35.0
|
%
|
35.0
|
%
|
||||
State
taxes, net of federal tax benefit
|
3.6
|
|
3.2
|
|
3.5
|
|
||||
Percentage
depletion deduction
|
(3.1
|
)
|
(2.8
|
)
|
(2.3
|
)
|
||||
Minority
interest in joint ventures
|
2.2
|
|
(4.1
|
)
|
(3.2
|
)
|
||||
Other
|
(3.5
|
)
|
(2.2
|
)
|
(3.0
|
)
|
||||
Effective
tax rate
|
34.2
|
%
|
29.1
|
%
|
30.0
|
%
|
December
31,
|
2006
|
2005
|
|||||
Deferred
tax assets:
|
|||||||
Accounts
receivable
|
$
|
3,333
|
$
|
1,625
|
|||
Inventory
|
4,390
|
3,680
|
|||||
Property
and equipment
|
-
|
373
|
|||||
Insurance
|
1,098
|
2,793
|
|||||
Deferred
compensation
|
10,833
|
4,537
|
|||||
Other
accrued liabilities
|
11,633
|
17,282
|
|||||
Contract
recognition
|
21,061
|
1,831
|
|||||
Net
operating loss carryforward
|
9,947
|
7,133
|
|||||
Valuation
allowance
|
(9,947
|
) |
(7,133
|
)
|
|||
Total
deferred tax assets
|
$ |
52,348
|
$ |
32,121
|
|||
Deferred
tax liabilities:
|
|||||||
Property
and equipment
|
$ |
35,300
|
$ |
44,962
|
|||
Unrealized
gain on marketable securities
|
1,675 | 994 | |||||
Other
|
921
|
494
|
|||||
Total
deferred tax liabilities
|
$
|
37,896
|
$
|
46,450
|
Years
Ending December 31,
|
||||
2007
|
$
|
11,702
|
||
2008
|
3,850
|
|||
2009
|
3,244
|
|||
2010
|
2,739
|
|||
2011
|
2,790
|
|||
Later
years (through 2056)
|
18,382
|
|||
Total
|
$
|
42,707
|
Years Ended December 31, |
HCD
|
Branch
|
Total
|
|||||||
2006
|
||||||||||
Revenues
from external customers
|
$
|
1,122,418
|
$
|
1,812,195
|
$
|
2,934,613
|
||||
Intersegment
revenue transfer
|
(36,530
|
) |
36,530
|
-
|
||||||
Net
revenue
|
1,085,888
|
1,848,725
|
2,934,613
|
|||||||
Depreciation,
depletion and amortization
|
14,545
|
51,222
|
65,767
|
|||||||
Operating
(loss) income
|
(137,343
|
) | 264,508 |
127,165
|
||||||
Property
and equipment
|
44,743
|
360,989
|
405,732
|
|||||||
2005
|
||||||||||
Revenues
from external customers
|
$
|
1,061,441
|
$
|
1,560,213
|
$
|
2,621,654
|
||||
Intersegment
revenue transfer
|
(31,332
|
)
|
31,332
|
-
|
||||||
Net
revenue
|
1,030,109
|
1,591,545
|
2,621,654
|
|||||||
Depreciation,
depletion and amortization
|
15,372
|
44,651
|
60,023
|
|||||||
Operating
income
|
12,472
|
153,675
|
166,147
|
|||||||
Property
and equipment
|
48,862
|
314,746
|
363,608
|
|||||||
2004
|
||||||||||
Revenues
from external customers
|
$
|
872,812
|
$
|
1,263,400
|
$
|
2,136,212
|
||||
Intersegment
revenue transfer
|
(24,215
|
)
|
24,215
|
-
|
||||||
Net
revenue
|
848,597
|
1,287,615
|
2,136,212
|
|||||||
Depreciation,
depletion and amortization
|
14,386
|
42,581
|
56,967
|
|||||||
Operating
income
|
8,957
|
106,016
|
114,973
|
Years
ended December 31,
|
2006
|
2005
|
2004
|
|||||||
Total
operating income for reportable segments
|
$
|
127,165
|
$
|
166,147
|
$
|
114,973
|
||||
Other
income
|
24,381
|
7,396
|
11,372
|
|||||||
Gain
on sales of property and equipment
|
10,408
|
8,235
|
18,566
|
|||||||
Unallocated other corporate expenses | (63,864 | ) | (48,894 | ) | (48,297 | ) | ||||
Granite
Land Company operating income (loss) excluding gain on sales of property
and equipment
|
14,927 | 9,427 | (1,690 | ) | ||||||
Income
before provision for income taxes and minority interest
|
$
|
113,017
|
$
|
142,311
|
$
|
94,924
|
|
|
|
|||||
December
31,
|
2006
|
2005
|
|||||
Total property
and equipment for reportable segments
|
$
|
405,732
|
$
|
363,608
|
|||
Assets
not allocated to segments:
|
|
|
|||||
Cash
and cash equivalents
|
204,893
|
199,881
|
|||||
Marketable
securities
|
189,985
|
101,500
|
|||||
Deferred
income taxes
|
36,776
|
22,996
|
|||||
Other
current assets
|
700,499
|
685,531
|
|||||
Property
and equipment
|
24,234
|
33,503
|
|||||
Other
assets
|
70,719
|
65,211
|
|||||
Consolidated
total assets
|
$
|
1,632,838
|
$
|
1,472,230
|
/s/
William G.
Dorey
|
William
G. Dorey, President, Chief Executive Officer
and
Director
|
/s/
William E.
Barton
|
William
E. Barton, Senior Vice President and Chief Financial
Officer, Principal
Accounting and Financial Officer
|
/s/
David H.
Watts
|
David
H. Watts, Chairman of the Board and Director
|
/s/
Claes G.
Bjork
|
Claes
G. Bjork, Director
|
/s/
James W.
Bradford
|
James
W. Bradford, Director
|
/s/
Gary M.
Cusumano
|
Gary
M. Cusumano, Director
|
/s/
Linda
Griego
|
Linda
Griego, Director
|
/s/
David H.
Kelsey
|
David
H. Kelsey, Director
|
/s/
Rebecca A.
McDonald
|
Rebecca
A. McDonald, Director
|
/s/
J. Fernando
Niebla
|
J.
Fernando Niebla, Director
|
/s/
William H.
Powell
|
William
H. Powell, Director
|
Description
|
Balance
at Beginning of Year
|
Charged to
Expense
|
Deductions
|
Balance
at End of Year
|
|||||||||
YEAR
ENDED DECEMBER 31, 2006
|
|||||||||||||
Allowance
for long-term receivable
|
$ | 3,500 | $ |
-
|
$ | - | $ | 3,500 | |||||
YEAR
ENDED DECEMBER 31, 2005
|
|||||||||||||
Allowance
for long-term receivable
|
$ | - | $ | 3,500 | $ | - | $ | 3,500 | |||||
YEAR
ENDED DECEMBER 31, 2004
|
|||||||||||||
Allowance
for long-term receivable
|
$ | - | $ | - | $ | - | $ | - | |||||
S-1
|
Exhibit
No.
|
|
Exhibit
Description
|
|
|
|
3.1
|
*
|
Certificate
of Incorporation of Granite Construction Incorporated [Registration
Statement on Form S-1, File No. 33-33795]
|
3.1.a
|
*
|
Amendment
to the Certificate of Incorporation of Granite Construction Incorporated
[Exhibit 3.1.a to 10-K for year ended December 31, 1998]
|
3.1.b
|
*
|
Amendment
to Certificate of Incorporation of Granite Construction Incorporated
[Exhibit 3.1.b to 10-K for year ended December 31, 2000]
|
3.1.c
|
*
|
Certificate
of Correction of Certificate of Incorporation of Granite Construction
Incorporated effective January 31, 2001 [Exhibit 3.1.c to 10-K
for year
ended December 31, 2000]
|
3.1.d
|
*
|
Certificate
of Correction of Certificate of Incorporation of Granite Construction
Incorporated filed May 22, 1998, effective January 31, 2001 [Exhibit
3.1.d
to 10-K for year ended December 31, 2000]
|
3.1.e
|
*
|
Certificate
of Correction of Certificate of Incorporation of Granite Construction
Incorporated filed May 23, 2000, effective January 31, 2001 [Exhibit
3.1.e
to 10-K for year ended December 31, 2000]
|
3.1.f
|
*
|
Amendment
to the Certificate of Incorporation of Granite Construction Incorporated
effective May 25, 2001 [Exhibit 3.1 to 10-Q for quarter ended June
30,
2001]
|
3.1.g
|
*
|
Certificate
of Incorporation of Granite Construction Incorporated as Amended
effective
May 25, 2001 [Exhibit 3.1.a to 10-Q for quarter ended June 30,
2001]
|
3.1.h
|
*
|
Certificate
of Amendment to Granite’s Certificate of Incorporation, filed with the
Delaware Secretary of State on May 25, 2006 [Exhibit 3.1.a to 10-Q
for
quarter ended June 30, 2006]
|
3.2.a
|
*
|
Bylaws
of Granite Construction Incorporated, as amended and restated effective
February 27, 1991 [Exhibit 3.2 to 10-K for year ended December
31,
1991]
|
3.2.b
|
*
|
Bylaws
of Granite Construction Incorporated, as amended effective March
23, 2006
[Exhibit 3.2 to 8-K filed March 29, 2006]
|
10.1
|
*
**
|
Amendment
to and Restatement of the Granite Construction Incorporated Key
Management
Deferred Compensation Plan adopted and effective January 1, 1998
[Exhibit
10.8 to 10-K for year ended December 31, 1998]
|
10.1.a
|
*
**
|
Amendment
1 to Granite Construction Incorporated Key Management Deferred
Compensation Plan dated April 23, 1999 [Exhibit 10.6.a to 10-K
for year
ended December 31, 1999]
|
10.1.b
|
*
**
|
Amendment
2 to Granite Construction Incorporated Key Management Deferred
Compensation Plan dated March 24, 2003 [Exhibit 10.1 to 10-Q for
quarter
ended March 31, 2003]
|
10.1.c
|
*
**
|
Amendment
3 to Granite Construction Incorporated Key Management Deferred
Compensation Plan dated December 12, 2005 [Exhibit 10.1.c to 10-K
for year
ended December 31, 2005]
|
10.2
|
*
**
|
Amendment
to and Restatement of the Granite Construction Incorporated Key
Management
Deferred Incentive Compensation Plan adopted and effective January
1, 1998
[Exhibit 10.9 to 10-K for year ended December 31, 1998]
|
10.2.a
|
*
**
|
Amendment
1 to Granite Construction Incorporated Key Management Deferred
Incentive
Compensation Plan dated April 23, 1999 [Exhibit 10.7.a to 10-K
for year
ended December 31, 1999]
|
10.2.b
|
*
**
|
Amendment
2 to Granite Construction Incorporated Key Management Deferred
Incentive
Compensation Plan dated November 1, 2001 [Exhibit 10.9.b to 10-K
for year
ended December 31, 2001]
|
10.2.c
|
*
**
|
Amendment
3 to Granite Construction Incorporated Key Management Deferred
Incentive
Compensation Plan dated December 12, 2005 [Exhibit 10.2.c to 10-K
for year
ended December 31, 2005]
|
10.3
|
*
**
|
Granite
Construction Incorporated Amended and Restated 1999 Equity Incentive
Plan
as amended effective January 1, 2005 [Exhibit 10.1 to 8-K filed
March 29,
2006]
|
10.4
|
*
|
Credit
Agreement dated as of June 24, 2005 [Exhibit 10.1 to 10-Q for quarter
ended June 30, 2005]
|
10.4.a
|
*
|
Amendment
No. 1 to the June 24, 2005 Credit Agreement dated as of June 23,
2006
[Exhibit 10.1 to 10-Q for quarter ended June 30, 2006]
|
10.5
|
*
|
Guaranty
Agreement dated as of June 24, 2005 from the Subsidiaries of Granite
Construction Incorporated as Guarantors of financial accommodations
pursuant to the terms of the Credit Agreement dated June 24, 2005
[Exhibit
10.2 to 10-Q for quarter ended June 30, 2005]
|
10.6
|
*
|
Note
Purchase Agreement between Granite Construction Incorporated and
certain
purchasers dated May 1, 2001 [Exhibit 10.3 to 10-Q for quarter
ended June
30, 2001]
|
10.6.a
|
*
|
First
Amendment to Note Purchase Agreement between Granite Construction
Incorporated and certain purchasers dated June 15, 2003 [Exhibit
10.4 to
10-Q for quarter ended June 30, 2003]
|
10.7
|
*
|
Subsidiary
Guaranty Agreement from the Subsidiaries of Granite Construction
Incorporated as Guarantors of the Guaranty of Notes and Note Agreement
and
the Guaranty of Payment and Performance dated May 1, 2001 [Exhibit
10.4 to
10-Q for quarter ended June 30, 2001]
|
10.8
|
*
|
Amendment
to and Restated Note Purchase Agreement between Granite Construction
Incorporated and certain purchasers dated November 1, 2001 [Exhibit
10.12
to 10-K for year ended December 31, 2001]
|
10.8.a
|
*
|
First
Amendment to Amended and Restated Note Purchase Agreement between
Granite
Construction Incorporated and certain purchasers dated June 15,
2003
[Exhibit 10.3 to 10-Q for quarter ended June 30, 2003]
|
10.9
|
*
|
Subsidiary
Guaranty Supplement from the Subsidiaries of Granite Construction
Incorporated as Guarantors of the Guaranty of Notes and Note Agreement
and
the Guaranty of Payment and Performance dated November 15, 2001
[Exhibit
10.13.a to 10-K for year ended December 31, 2001]
|
10.10
|
*
|
International
Swap Dealers Association, Inc. Master Agreement between BNP Paribas
and
Granite Construction Incorporated dated as of February 10, 2003
[Exhibit
10.5 to 10-Q for quarter ended June 30, 2003]
|
10.11
|
*
**
|
Form
of Amended and Restated Director and Officer Indemnification Agreement
[Exhibit 10.10 to 10-K for year ended December 31, 2002]
|
10.12
|
*
|
Employment
Agreement for William G. Dorey, dated April 20, 1990 [Exhibit 10.14
to
10-K/A for year ended December 31, 2004, filed May 18, 2005]
|
10.12.a
|
*
|
Assignment
and Amendment to Employment Agreement for William G. Dorey, dated
February
1, 1997 [Exhibit 10.14.a to 10-K/A for year ended December 31,
2004, filed
May 12, 2005]
|
10.13
|
*
|
Employment
Agreement for Mark E. Boitano, dated April 20, 1990 [Exhibit 10.15
to
10-K/A for year ended December 31, 2004, filed May 18, 2005]
|
10.13.a
|
*
|
Assignment
and Amendment to Employment Agreement for Mark E. Boitano, dated
February
1, 1997 [Exhibit 10.15.a to 10-K/A for year ended December 31,
2004, filed
May 12, 2005]
|
10.14
|
*
|
Employment
Agreement for William E. Barton, dated April 20, 1990 [Exhibit
10.16 to
10-K/A for year ended December 31, 2004, filed May 12, 2005]
|
10.14.a
|
*
|
Assignment
and Amendment to Employment Agreement for William E. Barton, dated
February 1, 1997 [Exhibit 10.16.a to 10-K/A for year ended December
31,
2004, filed May 12, 2005]
|
10.15
|
*
|
Employment
Agreement for James H. Roberts, dated March 18, 1999 [Exhibit 10.18
to
10-K/A for year ended December 31, 2004, filed May 12, 2005]
|
10.16
|
*
|
Employment
Agreement for Michael F. Donnino, dated January 22, 2004 [Exhibit
10.20 to
10-K for year ended December 31, 2005, filed March 2, 2006]
|
21
|
*
|
List
of Subsidiaries of Granite Construction Incorporated [Exhibit 21
to 10-K
for year ended December 31, 2005, filed March 2, 2006]
|
|
||
|
||
|
||
|