Gold Mountain Mines Its First Mineralized Material at the Elk Gold Project

VANCOUVER, BC / ACCESSWIRE / November 9, 2021 / Gold Mountain Mining Corp. ("Gold Mountain" or the "Company") (TSXV:GMTN)(OTCQB:GMTNF)(FRA:5XFA) is pleased to announce the Company has mined its first significant mineralized material at its 100% owned Elk Gold project near Merritt, BC.

Highlights:

  • The Company has exposed its 1100 vein system located on the footwall of historic pit 2.
  • This area was mined by previous operators in 2012 at an average grade of 16.60 g/t.
  • The Company will crush, weigh and assay the material prior to sending it to its Ore Purchase partners New Gold Inc.
  • Year 1 of Gold Mountain's mine plan contemplates mining some of the resource's highest-grade material, resulting in an expected annual after-tax profit of $10,000,000.

"First mineralization along our 1100 vein in Siwash North marks the Company's transition from development into commercial production," commented Director and CEO Kevin Smith. "Since purchasing the Elk Gold mine there have been questions surrounding Management's ability to increase resources and get the project back into production. Fast forward to today, we're targeting our third resource update, have successfully navigated the Provincial permit amendment process, completed all of our construction and are now stockpiling paydirt from our shallow mineralization. By completing our waste rock stripping and site preparation in parallel to our work with Indigenous Communities and Provincial Regulators on our permitting, we have been able to maintain our timelines of delivering material to New Afton and recognizing revenue in Q4 2021. The Mining Permit, TSX uplist and hitting mineralized material all in the first nine days of November highlights management's focus towards execution and maintaining our committed timelines. Keep an eye out for more developments, as we intend to continue delivering value to our loyal shareholders and a very strong finish to the year."

Mining Activities

After spending 4 months waste rock mining through its gravel borrow, Gold Mountain has exposed its first high-grade mineralized material at its Elk Gold mine. The targeted vein systems strikes east -west and are currently being mined at the footwall of historical Pit 2. This zone of the property was mined in 2012 by previous operators and yielded a grade of 16.60 g/t, surpassing the contained ounces in the resource model by roughly 29%. See section entitled "Preliminary Economic Assessment" below for more information.

The Company was able to transition into full-scale mining operations for less than its forecasted $9m capital expenditure due to the project's existing infrastructure. Gold Mountain also reduced its upfront costs by avoiding the need for an on-site mill and tailings storage facility through its Ore Purchase Agreement ("OPA") with New Gold Inc. The Company will be targeting some of the resource's highest-grade mineralization during the first year of its mine plan, expediting the payback period to 6 months.

Next Steps

With the Company hitting mineralized material, it is in a strong position to achieve revenue in Q4 ‘21. Gold Mountain will now turn its focus to the following operating milestones:

  • Continue to engage directly with surrounding Indigenous Communities to adhere to each Nation's independent review process.
  • Ramp up mining operations, targeting the Elk's high-grade 1100 and 1300 vein systems.
  • Deliver material to New Gold's New Afton mine in Kamloops, located 133 km from the Elk Gold Project.
  • Begin revenue generation and receive payment from its first mineralized material delivery.

The Company will mine, crush and sample the mineralized material prior to hauling the load 133km to its Ore Purchase Partner New Gold Inc.'s New Afton Mine in Kamloops, British Columbia. Haul trucks will be weighed on-site and a third-party lab will assay the batch sample to determine the grade and value of the load. Gold Mountain will be paid monthly, based on the weight and grade of all deliveries during the previous month. The Company filed a copy of the Ore Purchase Agreement on February 3, 2021 and can be viewed on the Company's SEDAR profile at www.SEDAR.com.

New Gold is working with Indigenous Nations and local regulators to amend its permit which will allow the mine to receive the Elk Gold's high-grade mineralized material. Both companies anticipate this will not interrupt Gold Mountain's mining processes and revenue forecast for Q4 2021.

Qualified Person

The foregoing technical information was approved by Grant Carlson, P.Eng., a Qualified Person, as defined under National Instrument 43-101 and the Chief Operating Officer for the Company.

Preliminary Economic Assessment

For details on the key assumptions behind the 2012 mining of the historical pit 2, the Company's Year 1 production profile, the anticipated cash flow and the anticipated payback period of capital, please see the Preliminary Economic Assessment entitled "Updated Preliminary Economic Assessment on the Elk Gold Project" dated August 26, 2021 with an effective date of May 14, 2021 and amended as of November 4, 2021 a copy of which is available on SEDAR (the "PEA").

The Company's mine plan and annual after-tax profit are based on the PEA which is preliminary in nature and includes inferred resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the PEA will be realized.

About Gold Mountain Mining

Gold Mountain is a British Columbia based gold and silver exploration and development company focused on resource expansion at the Elk Gold Project, a past-producing mine located 57 KM from Merritt in South Central British Columbia. Additional information is available at www.sedar.com or on the Company's new website at www.gold-mountain.ca.

For Further information, please contact

Gold Mountain Mining Corp.
Kevin Smith, Director and Chief Executive Officer
Phone: 604-309-6340
Email: ks@gold-mountain.ca
Website: www.gold-mountain.ca

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) has reviewed or accepts responsibility for the adequacy or accuracy of this Release

This news release includes certain "forward-looking statements" under applicable Canadian securities legislation. Forward- looking statements include statements that are based on assumptions as of the date of this news release and are not purely historical including any information or statements regarding beliefs, plans, expectations or intentions regarding the future and often, but not always, use words or phrases such as "expects" or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", "estimates" or "intends", or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. Forward looking statements in this press release include all statements relating to the anticipated Year 1 production profile and anticipated profits, the timing for the receipt of any EA, the timing to commence mining, the timing for the delivery of mineralized material to New Afton. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking statements. Such factors include, but are not limited to: general business, economic, competitive, political and social uncertainties; delay or failure to receive board, shareholder or regulatory approvals; the price of gold; and the results of current exploration. There can be no assurance that such statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Gold Mountain disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law. For a comprehensive overview of all risks that may impact the Company, please see the Company's Annual Information Form for the year ended January 31, 2021 which was filed on the Company's SEDAR profile on November 4, 2021.

SOURCE: Gold Mountain Mining Corp



View source version on accesswire.com:
https://www.accesswire.com/671823/Gold-Mountain-Mines-Its-First-Mineralized-Material-at-the-Elk-Gold-Project

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.