Lomiko Announces Completion of Exploration Drilling for its La Loutre Graphite Project

Lomiko Metals Inc. (TSX.V: LMR) (“Lomiko Metals” or the “Company”) is pleased to announce that it has completed its infill and extension exploration drilling program at its wholly-owned La Loutre graphite project, located within the Kitigan Zibi Anishinabeg (KZA) First Nations territory within the Outaouais and Laurentides regions, 180 kilometers northwest of Montreal.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20220913006281/en/

Figure 1. EV Zone Drill Map (Graphic: Business Wire)

Figure 1. EV Zone Drill Map (Graphic: Business Wire)

The comprehensive drill program featured 79 holes totaling 13,113 metres drilled; 53 of these, totaling 9,037 metres, were drilled in the Electric Vehicles (“EV”) Zone and 26 holes totaling 4,076 metres were drilled in the Battery Zone. The Company is awaiting further assay results which will be shared when available.

The Preliminary Economic Assessment (PEA) for the La Loutre project confirmed that the EV and Battery Zones are sources of material that, when processed, would yield concentrated graphite of high purity over 95% graphitic carbon (Cg) (see press release of July 29, 2021 for more details). The objective of the 2022 exploration campaign was to better understand the extent and quality of the deposit and provide the required inputs for a pre-feasibility study.

Lomiko Metals thanks Breakaway Exploration Management of Québec for the supervision and operation of the 2022 exploration drilling program at the La Loutre project and ensuring compliance with ECOLOGO specifications. Lomiko also advises that it maintained its obligations to ensure departure before the seasonal hunting that occurs on the northern end of the claim. Lomiko has retained InnovExplo Consulting and Engineering to prepare an updated NI-43-101 resource estimate for the La Loutre project following the completion of the drilling and assay results receipt.

Please refer to Figure 1 and 2 for details.

Qualified Person

The technical content presented in this press release was reviewed by Mark Fekete, P.Geo. who actively participated in the La Loutre drill program as an independent consultant to the Company as the “Qualified Person” as that term is defined under National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

About Lomiko Metals Inc.

Lomiko Metals has a new vision and a new strategy in new energy. Lomiko represents a company with a purpose: a people-first company where we can manifest a world of abundant renewable energy with Canadian and Quebec critical minerals for a solution in North America. Our goal is to create a new energy future in Canada where we will grow the critical minerals workforce, become a valued partner and neighbour with the communities in which we operate, and provide a secure and responsibly sourced supply of critical minerals. Lomiko is ECOLOGO certified.

The Company holds a 100% interest in its La Loutre graphite development in southern Quebec. The La Loutre project site is located within the Kitigan Zibi Anishinabeg (KZA) First Nations territory. The KZA First Nations are part of the Algonquin Nation and the KZA territory is situated within the Outaouais and Laurentides regions.​ Located 180 kilometres northwest of Montreal, the property consists of 1 large, continuous block with 76 minerals claims totaling 4,528 hectares (45.3 km2). Lomiko Metals published a Preliminary Economic Assessment (“PEA”) on July 29, 2021 which indicated the project had a 15-year mine life producing per year 100,000 tonnes of the graphite concentrate at 95%Cg or a total of 1.5Mt of the graphite concentrate. This report was prepared as National Instrument 43-101 Technical Report for Lomiko Metals Inc. by Ausenco Engineering Canada Inc., Hemmera Envirochem Inc., Moose Mountain Technical Services, and Metpro Management Inc., collectively the Report Authors. The Bourier project site is located near Nemaska Lithium and Critical Elements south-east of the Eeyou Istchee James Bay territory in Quebec which consists of 203 claims, for a total ground position of 10,252.20 hectares (102.52 km2), in Canada’s lithium triangle near the James Bay region of Quebec that has historically housed lithium deposits and mineralization trends.

For more information on Lomiko Metals, review the website at www.lomiko.com, contact Belinda Labatte at 647-402-8379 or email: info@lomiko.com.

Cautionary Note Regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of the applicable Canadian securities legislation that is based on expectations, estimates, projections and interpretations as at the date of this news release. The information in this news release about the Company; and any other information herein that is not a historical fact may be "forward-looking information" (“FLI”). All statements, other than statements of historical fact, are FLI and can be identified by the use of statements that include words such as "anticipates", "plans", "continues", "estimates", "expects", "may", "will", "projects", "predicts", “proposes”, "potential", "target", "implement", “scheduled”, "intends", "could", "might", "should", "believe" and similar words or expressions. FLI in this new release includes, but is not limited to: the Company’s objective to become a responsible supplier of critical minerals, exploration of the Company’s projects, including expected costs of exploration and timing to achieve certain milestones, including satisfactory completion of due diligence and ability to reach an agreement with third party owners in connection with projected acquisitions, timing for completion of exploration programs; the Company’s ability to successfully fund, or remain fully funded for the implementation of its business strategy and for exploration of any of its projects (including from the capital markets); any anticipated impacts of COVID-19 on the Company’s business objectives or projects, the Company's financial position or operations, and the expected timing of announcements in this regard. FLI involves known and unknown risks, assumptions and other factors that may cause actual results or performance to differ materially. This FLI reflects the Company’s current views about future events, and while considered reasonable by the Company at this time, are inherently subject to significant uncertainties and contingencies. Accordingly, there can be no certainty that they will accurately reflect actual results. Assumptions upon which such FLI is based include, without limitation: potential of future acquisitions presently evaluated by the Company; current market for critical minerals; current technological trends; the business relationship between the Company, local communities and its business partners; ability to implement its business strategy and to fund, explore, advance and develop each of its projects, including results therefrom and timing thereof; the ability to operate in a safe and effective manner; uncertainties related to receiving and maintaining exploration, environmental and other permits or approvals in Quebec; any unforeseen impacts of COVID-19; impact of increasing competition in the mineral exploration business, including the Company’s competitive position in the industry; general economic conditions, including in relation to currency controls and interest rate fluctuations.

The FLI contained in this news release are expressly qualified in their entirety by this cautionary statement, the “Forward-Looking Statements” section contained in the Company’s most recent management’s discussion and analysis (MD&A), which is available on SEDAR at www.sedar.com, and on the investor presentation on its website. All FLI in this news release are made as of the date of this news release. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not undertake to update or revise any such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except as may be required by applicable securities laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

On behalf of the Board,

Belinda Labatte

CEO and Director, Lomiko Metals Inc.

Contacts

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.